Lenovo ThinkEdge SE455 V3 User Manual page 111

Table of Contents

Advertisement

Step 4.
Make sure the front drive backplane cables are secured in the cable clip on the front drive cage. If
necessary, route the front backplane power cable into the cable clip; then, route the front
backplane signal cable into the cable clip.
Figure 72. Front drive backplane cable routing
After this task is completed
1. Reinstall the drives and drive bay fillers (if any) into the front drive bays. See
drive" on page
103.
2. Complete the parts replacement. See
Install a front hot-swap drive
Follow instructions in this section to install a front hot-swap drive.
About this task
Attention:
• Read
"Installation Guidelines" on page 39
work safely.
• Touch the static-protective package that contains the drive to any unpainted metal surface on the
solution; then, remove the drive from the package and place it on a static-protective surface.
• Make sure you save the data on your drive, especially if it is part of a RAID array, before you remove it
from the server.
• To avoid damage to the drive connectors, make sure that the server top cover is in place and fully closed
whenever you install or remove a drive.
• To make sure that there is adequate system cooling, do not operate the server for more than two minutes
without either a drive or a drive bay filler installed in each bay.
• Before you make changes to drives, drive controllers (including controllers that are integrated on the
system board), drive backplanes, or drive cables, back up all important data that is stored on drives.
"Complete the parts replacement" on page
and
"Safety inspection checklist" on page 40
Chapter 5
"Install a front hot-swap
225.
to ensure that you
.
Hardware replacement procedures
103

Advertisement

Table of Contents
loading

Table of Contents