Download Print this page

TMG -DT5040CG Product Manual page 41

50' x 40' dual truss container hoop shelter

Advertisement

AFTER THE INSTALLATION
Walk around and inspect the building periodically to make sure all components are still firmly secured and the
whole building is well supported. Check all bolts and nuts as well as all connection points to make sure they are
all in good position. Check the base plates, adjust the ropes and tie downs if required and clean the cover
regularly.
Snow accumulating on the fabric cover must be removed as soon as possible. If snow becomes solid ice on the
cover, it will increase the weight on the roof and collapses the building or reduce the life span eventually.
Keep the building on a dry ground most of the time. Do not keep the fabric dirt skirt under water all the time,
otherwise the fabric will deteriorate.
We strongly recommend you remove any snow from the roof immediately. Do not leave any snow load on the roof
overnight. Keep 3 feet of clearance onall sides at all times. Do not allow snow to accumulate and pile up on the
sides of the building. Otherwise the push from the sides toward inside will make the building collapsed at some
point.
40/40
TOLL FREE:1-877-761-2819
►www.tmgindustrial.com

Advertisement

loading