  • Page 2: Main Specifications

    Main Specifications :  Assembly size : W10 x L24 x H6 (m) / 33 x 79 x 20 (ft)  Ridge height : 6m / 20 ft  Peak clearance : 5.4m / 18 ft  door : 5.7x 2.68 (m) / 19 x 9 (ft) ...
  • Page 3 TMG-DT3380 Part List Parts Graphical Description Length Code Peak arch tube φ48xL2570mm (for 7 middle trusses ) Peak arch tube φ48xL2570mm (for front and rear trusses) Upper rafter tube φ48xL3389mm (for middle trusses) Upper rafter tube φ48xL3389mm (for front and rear...
  • Page 4 Baseplate W150xL200mm Baseplate for front and W260xL520mm rear truss left corners Baseplate for front and W260xL520mm rear truss right corners Baseplates for middle W260xL480mm truss Ratchets φ16x150mm Expansion bolts Middle upper vertical φ48xL2555mm tubes φ48xL2896mm Lower vertical tubes Left and right upper φ48xL1588mm vertical tubes φ48xL2288mm...
  • Page 5 Ridge steel tension φ6xL3590mm cables Tie down straps W38xL800mm Cable connection plate T3xL91mm Tension tube end water (φ32mm) plug (φ48mm) Tube clamps Scratch resistant tape L10m Self locking bolt and M10x70mm nuts Strengthened bolt and M12x30mm nuts Strengthened bolt and M12x40mm nuts Hex bolt and nuts...
  • Page 6 Installation steps Step 1 : Review the whole structure and choose the proper installation site. Choose a solid level ground area to set up the building. Do not install in an area where the floor is soft, a wetland, can not take the weight, or keep the building steady. We strongly recommend to install the building on a concrete foundation with all expansion bolts to secure all baseplates.
  • Page 7  Parts used in this step : • (2) Baseplates (#6L) • (2) Baseplates (#6R) • (7) Baseplates (#7) • (6) Baseplates (#6) • (56) Expansion bolts (#7B) Figure 1  Installation diagram of expansion bolt. ▶ W W W . T M G I N D U S T R I A L . C O M P 6 / 1 9 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9...
  • Page 8 Step 2 : Installing the door frame.  Install the door frame according to the base plate datum in figure 1.  Parts used in this step : • (1) Door upright column (#4L) • (1) Door upright column (#4R) •...
  • Page 9 Step 3 : Assemble all trusses. • The building includes 9 trusses : (1) front truss, (1) rear truss, and (7) middle trusses.The front and rear trusses installed with the fabric panel #30. • Parts used to install the front truss and rear truss in this step (refer to figure 3). •...
  • Page 10  Parts used to install (7) middle trusses in this step (refer to figure 4). • (1x7) Peak arch tube (#1) • (2x7) Upper rafter tube (#2) • (1x7) Shoulder tube (#3) • (1x7) Shoulder tube (#3B) • (1x7) Sidewall tube (#4) •...
  • Page 11  Lay down all (9) trusses on the ground when the assembly is all completed and before moving to next step, and scratch resistant tape (#22) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 12 Step 4 : Put up the front truss.  Put up the front truss: use a crane is the best and safest way, otherwise pull with ropes is another option, but you have to make sure it is safe, and you have enough manpower.
  • Page 13 Step 5 : Put up the rest trusses.  Refer to Step 4 to put up the rest trusses, connect all purlins (#5) with bolt (#23) and secure all bolts firmly on each span before going to next truss. (refer to figure 7) •...
  • Page 14  Repeat above step to put up all other trusses (from 3rd to 9th truss), and connect all purlins. Now the whole structure is completely up. (refer to figure 8)  Parts used in this step . • (56) Roof purlin (#5) •...
  • Page 15  Tension cable installation: All cables are diagonally installed on each side of the interval as figure 9. • (14) Sidewall frame steel tension cables (#16) • (33) Ridge steel tension cables (#17) • (31) Cable connection plate (#19) Figure 9 ▶...
  • Page 16  The whole structure inspection: check all components and trusses to make sure the whole structure is squared to the base line drawn at the step 1. All trusses must be set up righted at 90 degree. All purlins must be straight inline. If any purlins are not in line with they will need to be corrected before moving to the next step.
  • Page 17 Step 7 : Install front and rear cover panels.  Lift up (#30) cover panels, starting from the center point of the frame (highest ridge point) use ropes (#28) through the grommets to tie the panel to the truss firmly. All grommets need to be tied to the frame as shown in figure 11.
  • Page 18 Step 8 : Install roof cover (#29). NOTE : The cover must be installed on a windless day. DO NOT attempt to install the cover during windy conditions.  As shown on figure 12, when you are ready to install the roof cover, unpack the cover and position it parallel to the building frame on one side.
  • Page 19 Step 9 : Tension the cover on the frame from side to side (Figure 13).  After the cover is installed on the roof, insert the plastic pipe #31slowly into the grooves on two ends of the cover (not two sides), and then insert tension tubes (#13) in the groove on both sides of the cover bottom, Add the water plug (#20) on the 1st tube (#13) to protect the fabric while the tube is going through and add the water plug on the last tube also to keep water away.
  • Page 20 Step 10 : Tighten roof cover on front and rear trusses frames.  Pull and stretch the cover enough only to take wrinkles out. Repeat for the rear truss. Do not over stretch to rip off the grommets.  After the cover is placed and adjusted evenly across the grommet flap, go back and re-adjust all ratchets along the side edges.