Refrigera
nt Charge
Amount
Charge
amount
(kg) =
Standard
charge
amount +
Extra
charge
amount

6.1.2 Vacuumizing

Prerequisites
● Before vacuumizing, check that the refrigerant pipe system has passed the air
tightness test and does not leak.
● Before vacuumizing, ensure that all connectors on the device are tightened.
● System high pressure may occur if the system is not vacuumed or is not
thoroughly vacuumed. Therefore, ensure that the system is thoroughly
vacuumed.
Procedure
Step 1 Check whether a low temperature component is installed on the outdoor side.
Issue 13 (2023-08-20)
Actual
One-
Way
Pipe
Length
(L)
60 m < L
≤ 100 m
NO TE
When the outdoor unit is NetCol500-A120, two indoor units can be connected.
NO TICE
If no low temperature component is installed on the outdoor side, connect the
pressure gauge and vacuum pump at the low-pressure and discharge pipe
needle valves to vacuumize the system simultaneously, as shown in
6-1.
Copyright © Huawei Digital Power Technologies Co., Ltd.
NetCol500-
NetCol500-
A060
A060 with
(NetCol500-
a Low
A120)
Temperatur
e
Component
9.2 + (L – 10)
35.8 + (L –
x 0.25
10) x 0.25
6 Power-On Commissioning
NetCo
NetCol500-
l500-
W055
A080
13.2 +
10 + (L – 10)
(L –
× 0.28
10) ×
0.25
Figure
137

Advertisement

Table of Contents
loading

Table of Contents