HIGHLANDER II: SECTION 5

INSTALLATION QUICK START

SECTION 5
INSTALLATION QUICK START
SITE PREP
Code Compliance
Upper Landing
Foundation Level
Hoistway Square
Electrical
Code: ASME 18.1 relative to residential or commercial,
NAEC and Local Building; NFPA 70 (electrical code).
POSITION LIFT BENEATH LANDING
Remove Top Cap
Remove Front Panel
Verify Overhead Clearance at 79" min
TIP: Use material handling equipment with lifting straps
to avoid injury/damage.
ASSEMBLE PLATFORM
Attach Platform to Carriage
Bolt on Side Walls
Platform Gate*
Attach and Wire Control Panel
Auto Ramp*
Tip: Use 2'x4' beneath platform base when connecting to
carriage.
INSTALL LANDING GATE*
Screw to Landing
Pre-run Wiring
* If required/included
HIGHLANDER II VERTICAL PLATFORM LIFTS:
24
17FEB2021 | 630-00113 REV C
INSTALL FASCIA PANEL*
Attach to Open Areas Under Gate
Ensure Smooth, Flush
No Gaps, Protrusions etc.
TIP: Use flat screw heads to avoid protrusions.
FINAL POSITIONING & ANCHORING
Level and Perpendicular
Anchor Tower Legs
Anchor Tower to Structure
Fixed Ramp Securement*
VERIFY CLEARANCES:
Platform opening to landing: 3/8" - 3/4"
Guard panel to hoistway wall: 2" - 3"
WIRING & ELECTRICAL
Gates*/Doors/Interlocks/Openers
Call/Sends*
Install and Connect Battery Backup*
Dedicated Line to Primary Power Source
TIP: Use knockouts provided along tower to minimize wire
distance.
FINAL
Perform Final Function Tests
Insert permanent power installation
Reattach Top Cap and Front Cover
Operator Familiarization
Complete Warranty Form
Write Date/Info on Lift
Install Manual