Installation - RAIS Q-Tee II USA User Manual

Hide thumbs Also See for Q-Tee II USA:
Table of Contents

Advertisement

Available languages

Available languages

Installation

Precautions and Specifications
Before installation, remember to consult your local building inspector or fire marshal
to determine the need to obtain a permit. Also enquire about restrictions and
installation inspection requirements in your area. If utilizing an existing chimney, it
is recommended that a professional mason or wood stove installer do a complete
check-up of the chimney, liner, and flue beforehand.
In order for the wood stove to work and draw properly, sufficient air supply is impor-
tant. Be especially aware of any mechanical fans (e.g. kitchen or bathroom exhaust
systems) that may affect the proper draft.
Do not use grates, andirons, or other fuel support methods. Build fire directly on
hearth.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q-tee ii c usa

Table of Contents