Combustion Air Conversions - Trane S8V2A040M3PC Installation, Operation And Maintenance Manual

Link communicating or 24 volt gas-fired 2 stage induced draft furnaces with variable speed motor
Table of Contents

Advertisement

Combustion Air Conversions

Important: After deciding the orientation of the flue outlet, cut the
metal tabs around the appropriate 5" metal cutout on the
furnace cabinet and remove the cutout, if necessary.
Note: When rotating the inducer it may be necessary to cut the wire
tie. A new wire tie must be installed once the inducer is rotated.
Note: Self-tapping screws are recommended for attaching the vent pipe to the inducer outlet.
Upflow orientation with top venting
Refer to
Upflow orientation with right side venting
Refer
Horizontal left orientation with top venting
Refer
S8V2-SVX001-1A-EN
Step 1.
Step 2.
to
Step 6.
Step 2.
to
Step 6.
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
Pressure Switch locations
S8V2: PS1 is connected to the inducer. PS2 is connected to the hot
header.
Upflow orientation with left side venting
Note: When rotating the inducer it may be necessary to cut the wire
tie. A new wire tie must be installed once the inducer is rotated.
Refer
Step 2.
Horizontal left orientation with left side venting
Refer to
Horizontal right orientation with right side venting
Refer to
to
Step 6.
Step 1.
Step 1.
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents