Trane S8V2A040M3PC Installation, Operation And Maintenance Manual page 52

Link communicating or 24 volt gas-fired 2 stage induced draft furnaces with variable speed motor
Table of Contents

Advertisement

F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
Horizontal right orientation with top venting
Refer
Step 2.
Downflow orientation with right side venting
Refer
I I n n s s t t a a l l l l a a t t i i o o n n I I n n s s t t r r u u c c t t i i o o n n s s
1. No changes need to be made to the inducer when
installing the furnace in upflow position when
vented through the top.
2. Before proceeding, lay unit on its back to make the
conversion easier.
3. Remove the four screws holding the inducer in
place.
52
to
Step 5.
and
Step 7.
Step 2.
to
Step 6.
Downflow orientation with left side venting
Refer
Step 2.
Downflow orientation with top venting
Note: Requires kit BAYVENT600. Kit used with B, C, and D cabinets
only. Follow kit instructions for installation.
Note: 4" Type B double wall vent pipe must be used inside of the
furnace cabinet.
Refer to
Step
2.,
Step
3.,
4. Rotate the inducer so the inducer outlet is pointing
towards the 5" cutout.
5. Secure the inducer in place using the screws
removed in step 3.
6. Attach the vent to the inducer outlet.
7. Attach the vent outlet gasket to the vent outlet.
8. Install BAYVENT600 kit per the kit instructions.
to
Step 6.
Step
4.,
Step 8.
and
Step 6.
S8V2-SVX001-1A-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents