F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
Downflow Furnace with Top Return
Refer to
Step
13.,
Step
Downflow Furnace with Top Return and Plenum with Filter Box
Refer to
Step
13.,
Step
I I n n s s t t a a l l l l a a t t i i o o n n I I n n s s t t r r u u c c t t i i o o n n s s
1. Remove the bottom plate.
2. Create ducting and set the furnace in place.
3. Match the filter cabinet flush to the back and
bottom sides of the furnace cabinet and secure in
place with screws.
4. Mark the two areas to be cut out for the return air.
5. Cut out the two sections of the cabinet and BAYLIFT
kit to be removed.
6. Attach ducting to the filter box.
7. The ducted pedestal will use ducted air from a
remote location.
8. Seal per local codes and requirements.
9. Using guides, remove the cutout for the side return.
40
14.,
Step
17., and
Step 8.
16.,
Step
14., and
Step 8.
Downflow Furnace with Top Return and Plenum
Refer to
Step
13.,
Step
10. Create ducting and set the furnace in place. Use
screws to attach ducting to the furnace cabinet.
11. Seal bottom panel per local codes and
requirements.
12. Seal all other panels per local codes and
requirements.
13. Remove the top plate.
14. Attach the ducting to the top of the furnace.
15. Attach the plenum ducting to the top of the furnace.
16. Attach the filter box to the top of the furnace.
17. Install remote filter.
15.,
Step
17., and
Step 8.