Important: A BAYBASE is required when installing the furnace on a combustible floor.
I I n n s s t t a a l l l l a a t t i i o o n n I I n n s s t t r r u u c c t t i i o o n n s s
1. Bend furnace flanges up.
2. Bend furnace side flanges down.
3. Set the coil on top of the furnace.
4. Support the furnace and coil independently.
S8V2-SVX001-1A-EN
Horizontal Right and Downflow Furnace — no Coil
Refer to
Step
1.,
Step
F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
6.,
Step 7.
5. Screw through the coil cabinet into the furnace
flange. Guide holes are located on the coil.
6. Attach ducting.
7. Seal per local codes and requirements.