Commissioning - WAGNER EvoMotion 20-30 Original Operating Manual

Piston pump
Hide thumbs Also See for EvoMotion 20-30:
Table of Contents

Advertisement

Operating manual Piston Pump EvoMotion 20-30
6   Assembly and Commissioning
Info
Safe operation of the pump is only guaranteed with a grounding connection. Connect all
grounding cables using a short and direct route.
1
B_06895
1
Grounding cable
1. Screw on grounding cable with eyelet.
2. Clamp the grounding cable clip to a grounding connection on site.
3. Ground the product tank to an on-site grounding connection.
4. Ground the other parts of the system to an on-site grounding connection (16 mm2;
AWG 6).
Ex zone
All devices and equipment must be suitable for use in potentially explosive areas.
– All paints, flushing agents and waste tanks have to be electrically conductive.
– All tanks must be grounded.
6.7   COMMISSIONING
WARNING
Gas mixtures can explode if there is an incompletely filled pump!
Danger to life from flying parts.
4 Ensure that the pump and suction system are always completely filled with flushing
agent or working medium.
4 Do not spray the device empty after cleaning.
NOTICE
Impurities in the spraying system
Spray gun blockage, products harden in the spraying system.
4 Flush the spray gun and paint supply with a suitable flushing agent before

commissioning.

Emergency stop, see Chapter Emergency Stop [8 33].
6.7.1   Preparation
Before every commissioning, the following points should be observed as laid down in the
operating manual:
1. Secure spray gun with safety lever.
Order number 2333553 | Edition 09/2020