Valve On Tank Assembly - Pentair Fleck 5600 SXT Installer Manual

Hide thumbs Also See for Fleck 5600 SXT:
Table of Contents

Advertisement

Installer manual Fleck 5600 SXT - Maintenance
9.4.9

Valve on tank assembly

1. Lubricate the seals with approved silicone grease.
2. Spin the valve (1) onto the tank (2), ensuring the threads are not cross-threaded.
3. Rotate the valve (1) clockwise and freely, without using force until it comes to a stop.
Info
This stop position is considered point zero.
4. Rotate the valve (1) clockwise from point zero to between ¼ turn and ½ turn.
Caution - material
Risk of damage due to excessive force !
Do NOT exceed 27 Nm of torque when installing the valve. Exceeding this limit may
damage the threads and cause failure.
Point 0
86 / 104
¼ turn
Point 0
½ turn
Ref. MKT-IM-013 / E - 23.09.2020

Advertisement

Table of Contents
loading

Table of Contents