Preventive Maintenance; Cleaning Instructions - IC Medical CRYSTAL VISION 450D Operating And Installation Manual

Table of Contents

Advertisement

PREVENTIVE MAINTENANCE

The
has minimal routine preventive maintenance and calibration requirements.
CRYSTAL VISION
®
EVERY SIX MONTHS:
Perform standard electrical leakage tests.
Perform
"Check Proper Operation of the Crystal
Perform
"Hospital Level
Calibration" only if the flow does not meet the specifications.
The service personnel should be properly trained and have the correct test equipment. If adjustments
are made without the correct test equipment or by a properly trained person, damage or
maladjustment may occur to the unit. This can pose a threat to patient safety
ANNUALLY:
Perform items listed under
Check the pump operation with a flow meter. Your reading should be 90 liters per minute or greater. Please remember to
factor in air temperature and pressure. If you experience any problems performing this test or the actual flow is less than 90
liters per minute, please have contact I. C. Medical, Inc.

CLEANING INSTRUCTIONS:

Cleaning should only be done to the external case of the smoke evacuator.
To reduce the possibility of being electrically shocked smoke evacuator should be unplugged before
cleaning.
1. Follow your facility's approved clean policy
2. Use your facility's approved cleaning agent for cleaning electronic medical equipment.
3. Dampen a cloth with your facility's approved cleaning agent.
4. Gently wipe the external surfaces of the smoke evacuator until clean.
Vision" as directed in a previous section.
"Every Six
Months."
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icm-450-0000

Table of Contents