Aerotech APR150DR Hardware Manual page 14

High-precision mechanical bearing rotary stage
Table of Contents

Advertisement

APR150DR
Gently set the stage on a smooth, flat, and clean surface. Use compressed nitrogen or clean, dry, oil-
free air to remove any dust or debris that has collected during shipping.
Before you operate the stage, let it stabilize at room temperature for at least 12 hours. This will
ensure that all of the alignments, preloads, and tolerances are the same as they were when they
were tested at Aerotech.
Each stage  has a label listing the system part number and serial number. These numbers contain
information necessary for maintenance or system hardware and software updates. Locate this label
and record the information for later reference.
Shipping Brackets
If the APR150DR has shipped as part of a system, shipping brackets (typically red, anodized
aluminum) might have been installed to secure the system prior to shipment. The shipping clamps, if
installed, will need to be removed prior to machine start up.
Storage
Store the stage in the original shipping container. If the original packaging included ESD protective
packaging, make sure to store the stage in it. The storage location must be dry, free of dust, free of
vibrations, and flat.
Refer to
Section 1.1. Environmental Specifications
14
Hardware Manual
www.aerotech.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apr150dr-115Apr150dr-135Apr150dr-180

Table of Contents