Standard Installation Manual - Yamato IC103CW Manual

Economy incubator
Hide thumbs Also See for IC103CW:
Table of Contents

Advertisement

*Install the product according to the following: (Confirm separately for optional items or special
specifications)
Model
Serial number
Item
Specifications
1
Included items
2
Installation
Operation-related matters
1
Source voltage
2
Operation start
Description
Operational
1
descriptions
2
Error codes
Maintenance
3
and inspection
Completion of
4
installation
Entries

14. Standard installation manual

Date
Implementation method
Check for number of staffs against
the included item field
・ Visual check of environmental
conditions
Caution:
Take
environment
・Securing a space
・ Measure the user side voltage
(outlet) with a tester
・ Measure voltage during operation
(shall meet the standard)
Caution: Always use a plug that
meets the specification for
attaching
to
switch.
・Starts operation
Performs fixed temperature ope-
ration, auto stop operation or auto
start operation
Explain operations of each compo-
nent according to the operational
instructions
Explain the customer about error
codes and procedures for release
according
to
the
instructions
Explain operations of each compo-
nent according to the operational
instructions
・ Fill in the installation date and the
installation mgr. on the nameplate
of the main unit
・ Fill in necessary information to
the warranty card and hand it
over to the customer
・ Explanation
of
the route
after-sales service
Installation mgr.
(company name)
TOC No. Reference page of the
operating instruction manual
10.Specifications field
2. Before operating the
care
for
unit
・On the installation site
2. Before operating the
unit
・ Be sure to connect
the ground wire.
・Power supply is ....
10. Specifications
the
power
・ Specification-power
supply
2. Before operating the
unit
・Installation
procedures...
4. Operating procedures
4. Operating procedures
・Operating
procedures
1. Safety precautions
~13. List of dangerous
materials
8. Troubleshooting
~9. After sales service
operational
and warranty
6. Maintenance
procedures
・ Daily
inspection/maintena
nce
9. After sales service and
warranty
for
42
Judg
Installation mgr.
ment
Judg
ment
P.37
P.4
P.6
P.6
P.37
P.4~
9
P.17~
29
P.17
~29
P.1
~41
P.34
36
P.32
P.36

Advertisement

Table of Contents
loading

Table of Contents