Yamato IC103CW Manual page 10

Economy incubator
Hide thumbs Also See for IC103CW:
Table of Contents

Advertisement

・Install shelf pegs at heights you want on the right and left shelf posts in the internal
chamber of the main body.
・Completely push shelf boards by sliding to the end.
*Take care to put each shelf board on correct pairs of right and left shelf pegs.
・Make sure that shelf boards will not fall nor rattle.
・Withstand load of each shelf board is 15kg in even loading. When putting samples,
arrange them as dispersed as possible.
・ Put samples with spaces between them.
temperature control. To assure proper temperature control, put samples with a space at
least 30% of the shelf board area.
(4)
Do not put a sample on the bottom of the internal chamber.
・Operating the unit with a sample directly put on the bottom of the internal chamber might
degrade its temperature characteristics. Also it may cause corrosion, damage or rusting
of the internal chamber and burning of samples or a fire. Never put any sample on the
bottom surface.
・When putting samples, take care not to allow them touching the wall, where sensor or other
devices are installed. Put samples on the shelf board included with the unit.
2. Before operating the unit
Installation procedures・precautions
15kg
Shelf board
Make at least 30% of space
8
Sample
Too many samples may prevent proper

Advertisement

Table of Contents
loading

Table of Contents