Tiso Gate-GS Operation Manual

Tiso Gate-GS Operation Manual

Waist-high turnstile servo-operated swing gate
Table of Contents

Advertisement

Quick Links

1
"TiSO-PRODUCTION" LTD
WAIST-HIGH TURNSTILE
SERVO-OPERATED SWING GATE
Gate- GS
Gate-GSH
Gate- TS
Gate-TTS
OPERATION MANUAL
AUIA.203 OM (rev.1.2.2)
UKRAINE
2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Gate-GS and is the answer not in the manual?

Questions and answers

Summary of Contents for Tiso Gate-GS

  • Page 1 “TiSO-PRODUCTION” LTD WAIST-HIGH TURNSTILE SERVO-OPERATED SWING GATE Gate- GS Gate-GSH Gate- TS Gate-TTS OPERATION MANUAL AUIA.203 OM (rev.1.2.2) UKRAINE 2023...
  • Page 2: Table Of Contents

    5.2 Turnstile transportation ..........................24 6 DISPOSAL ................................25 Annex А.1(mandatory) Overall and installation dimensions of “Gate-GS” type turnstile ......... 26 Annex А.2(mandatory) Overall and installation dimensions of “Gate-GSH” type turnstile ........27 Annex А.3(mandatory) Overall and installation dimensions of “Gate-TS” type turnstile ......... 28 Annex А.4(mandatory) Overall and installation dimensions of “Gate-TTS”...
  • Page 3: Introduction

    Operation Manual 3 INTRODUCTION This Operation Manual (hereinafter referred to as OM) covers the servo-operated waist-high turnstile of swing gate type (hereinafter referred to as the "turnstile"). The Operation Manual contains information about design, specifications, installation for proper operation and maintenance of the turnstile.
  • Page 4 Operation Manual 4 WARNINGS TO THE CUSTOMER ON SAFE OPERATION OF THE TURNSTILE These warnings are designed for ensuring of safety during operation of the turnstile to prevent violation of safety characteristics by improper installation or operation. These warnings are aimed at drawing attention of the customer to safety problems GENERAL WARNINGS The Operation Manual is an integral part of the product and it shall be handed over to the...
  • Page 5: Description And Operation

    Table 1 Dimensions, mm Designation Access way Max. Model Designation width weigh, kg Height Length Width modification Т3.KСН.SD Gate-TS AUIA.203-01 1000 Т3.KСН.PD 1065 Т3.KСН.KD Gate-TTS AUIA.203-02 700 -1050 1000 865-1215 Gate-GS AUIA.203 Т3.KСC.SD 1000 1065 Т3.KСC.PD Т3.KСC.KD Gate-GSH AUIA.203-03 1500 1065...
  • Page 6 Operation Manual 6 Fig. 1– Installation dimensions of the Swing Gate type turnstile 1.1.3 The operation condition parameters according to GOST 15150-69 for climatic modification NF4 are specified in Table 2. Operation conditions Parameter value Ambient temperature + 1 to + 40 °С Relative humidity 80 % at 20 ºС...
  • Page 7: Specifications

    Operation Manual 7 precipitations and solar radiation Vertical, deviation from vertical position no more than 1º to any Operating position side is tolerated 1.1.5 Reliability indices:  mean time to repair (without delivery time of spare parts, tools and accessories) – at most 6 hours;...
  • Page 8 3. - Housing; 6. - Actuator and control unit; 7. –Glass holder or place for leaf fixation 4. - Lid; Fig.2 - Design of the single turnstile “Gate-GS” and “Gate-TS” Leaf options for gates АUIA.203: «Gate GS» «Gate GSH» «Gate TS»...
  • Page 9: Design And Operation

    Operation Manual 9 1.3.4 The turnstile material of manufacture is carbon steel subject to painting, brushed stainless steel or polished stainless steel. 1.4 Design and operation 1.4.1 General appearance of the turnstile 1.4.1.1 The swing gate consists of assembly mechanism 2 with fixed base 1. (Fig.4). Housing 3 with leaf 5 from glass or tube is installed on the top of assembly mechanism 2.
  • Page 10 Operation Manual 10 a) “ Gate TS” b) “Gate GS” Legend: 1 – Base; 7 – Screws М16х22 -2 pcs.(for stainless steel tubular leaf) 2 – Assembly mechanism; or countersunk screws А2 М6х16-4pcs. with spring and 3 – Housing; flat washer (for glass leaf) 4 –...
  • Page 11: Instrumentation, Tools And Accessories

    Operation Manual 11 1.5 Instrumentation, tools and accessories Dedicated tools are not required for installation of the turnstile (multi-purpose measurement instrumentation and installation tools are sufficient (Fig. 6). 1.6 Description and operation of controllers as a component of the turnstile 1.6.1 Purpose of the turnstile controller РСВ.201.01.00.00 The controller is designed for acquisition of commands from external control devices (control panel, access control system etc.) and generation of control signals for swing gate...
  • Page 12 Operation Manual 12 «IN1» or «IN2» on «GND», the turnstile will open completely and only after a lapse of time it will start closing. There is no such delay via inputs «IN3» and «IN4», and the turnstile will start closing at once from the moment of disappearance of input signal, even if the turnstile is not fully opened.
  • Page 13 Operation Manual 13 Closing procedure begins upon expiration of 4 sec. after connection of input “IN1” or “IN2” with “GND” is open. In order to close the turnstile the controller actuates motor, having changed current polarity via it, that leads to rotation of leaf in opposite direction. In this case angle of leaf rotation and motor speed are controlled.
  • Page 14: Intended Use

    Operation Manual 14 Continued table 5 1) type of output – open collector; 2) peak voltage on X2/7 EXIT -MG2 privacy key – 50 V; Not applicable 3) peak current of public key – 5 A X2/8 +MG2 EXIT 1) voltage X2/9 MOT1 EXIT...
  • Page 15: Layout And Installation

    Operation Manual 15 IMPORTANT: MANUFACTURER WARNS OF THE NECESSITY TO KEEP SEALS OF THE MANUFACTURER ON THE TURNSTILE’S COMPONENTS! 2.2 Layout and installation 2.2.1 The turnstile and components of scope of supply to be delivered to installation site in factory packing. The turnstile to be unpacked only on installation site. 2.2.2 Preparation of the turnstile for installation (dismounting) and commissioning to be performed according to this OM with mandatory observation of safety measures specified in p.
  • Page 16 Operation Manual 16 Fig. 7 – Turnstile layout options...
  • Page 17 Operation Manual 17 2.2.6 Installation procedure The turnstile installation procedure is as follows: 1) The package integrity to be checked prior to unpacking. If package is damaged, then damages to be fixed (picture to be taken, damage report to be made). 2) The turnstile to be unpacked and inspected for defects and damages as well as completeness to be checked according to the turnstile technical passport;...
  • Page 18 Operation Manual 18 - Cables to be pulled through available access holes in the turnstile post bottom end part by tilting gate. - Fixation holes at the turnstile bottom plate to be aligned with prepared surface holes. - The turnstile to be fixed by means of anchors included in the scope of delivery.
  • Page 19 Operation Manual 19 12) Turnstile connection: a) Power supply cable ~220 V to be connected: - Phase L to be connected to the circuit breaker; - Neutral (N) to be connected to terminal ~220V (N); - Earth (РЕ) to be connected to earthing Gate mechanism controller terminal (РЕ).
  • Page 20 Operation Manual 20 2.2.7 Leaf initial position setting 1. The initial position setting button on the magnetic sensor board to be pushed (2); 2. Leaf to be set in the required initial position (mark on flange 1); 3. The button to be released (2); 4.
  • Page 21 Operation Manual 21 If the leaf turns more or less than 90° from the initial position when turning to one or the other side (mark 1 on Fig.13), it is necessary to adjust the left (4) or right (3) screw (Fig.
  • Page 22: Preparation For Use

    Operation Manual 22 2.3 Preparation for use 2.3.1 Commission guidelines Prior to the turnstile energization 1) make sure of proper connection and good condition of all connecting cables; 2) clear the turnstile’s leaf turning area from foreign particles. Rotation of leaf is locked when mains cable of power supply unit is connected to the network.
  • Page 23: Safety Measures

    Operation Manual 23 3.1.3 The turnstile to be installed and operated only by the qualified safety briefed staff having the relevant class of permit to work with electrical facilities with voltage up to 1000V, awaring of this OM, the turnstile design and principle of operation. 3.2 Safety Measures 3.2.1 During maintenance of the turnstile the relevant safety measures according to p.
  • Page 24: Routine Maintenance

    Operation Manual 24 – verification of the turnstile's performance during manual control in the modes specified in Table 7; – check of security of the turnstile's screw tightening; – lubrication with lubricant ОКB-122-7 according to GOST 18179-90, CIATIM-201 or Litol 24 (rubbing levers, wheel and pinion teeth of the turnstile actuator (monthly). 4 ROUTINE MAINTENANCE 4.1 General guidelines Minor malfunctions of the turnstile are listed in Table 8 and are remedied by the customer.
  • Page 25: Disposal

    Operation Manual 25 – in closed vehicles; – waterborne (in ship’s hold) Transportation on open platforms is allowed. In this case the packed turnstile to be covered with canvas. Air temperature during transportation should not be below -40°С and above +50°С. After transportation or storage of the turnstile at negative temperatures or increased humidity the turnstile to be kept indoor with normal climatic conditions without original packing within 12 hours before commissioning:...
  • Page 26: Annex А.1(Mandatory) Overall And Installation Dimensions Of "Gate-Gs" Type Turnstile

    Annex А.1 (mandatory) Overall and installation dimensions of “Gate-GS” type turnstile 650 / 900 584/ 835 815 / 1065 Ø Ø 50 Cable input Ø 50 Ø 4 3 hole ɲ Ø 225 815 / 1065 Figure А.1 – Swing Gate GS type turnstile with access way 650 mm and 900 mm...
  • Page 27: Annex А.2(Mandatory) Overall And Installation Dimensions Of "Gate-Gsh" Type Turnstile

    Annex А.2 (mandatory) Overall and installation dimensions of “Gate-GSH” type turnstile 70 / 5 7 9 7 84 8 4 650 / 00 815 / 065 Ø Ø 50 Cable input Ø 25 Ø 50 Ø 4 3 hole Figure А.2 – Swing Gate-GSH type turnstile with access way 650 mm and 900 mm...
  • Page 28: Annex А.3(Mandatory) Overall And Installation Dimensions Of "Gate-Ts" Type Turnstile

    Annex А.3 (mandatory) Overall and installation dimensions of “Gate-TS” type turnstile 650 / 900* 600 / 850* 815 / 1065* Ø Ø 50 Cable input Ø 50 ɲ Ø 4 Ø 225 3 holes 815 / 1065* Figure А.3 – Swing “Gate TS” type turnstile with access way 650 mm and 900 mm...
  • Page 29: Annex А.4(Mandatory) Overall And Installation Dimensions Of "Gate-Tts" Type Turnstile

    Annex А.4 (mandatory) Overall and installation dimensions of “Gate-TTS” type turnstile 1000 865 1215 Ø Ø 50 Ввод кабеля Ø 50 Ø 4 3 отв. ɲ Ø 25 865 / 1215* Figure А.4 – Swing Gate TTS type turnstile with access way 700 mm and 1050 mm...
  • Page 30: Annex B (Mandatory) Control Desk And Connection Diagram

    Annex B (mandatory) Control panel and connection diagram 1 – control panel housing; 4 – "SINGLE ACCESS" mode control button; 2 – front face; 6 – "FREE ACCESS" mode switch; 3, 5 – access direction LED displays; 7 – controller connection terminals Figure B.1 –...
  • Page 31 Continued Annex B Control panel and connection diagram Control board AUIA. 111.22.00.00 Cont. Circuit "1" « » LED CLOSED A LED OPEN «А» "2" "3" « » ACCESS ADMITTANCE A "4" +12V "5" COMMON « » "6" ACCESS ADMITTANCE B «...
  • Page 32: Annex C (Mandatory) Wiring Diagram Of Swing Gate Type Turnstile

    Annex C (mandatory) Wiring diagram of the Swing Gate type turnstile 730 3 +12V SPEED ANGLE 1 ANGLE 2 ZERO 3 Electromagnetic tooth brake SET ZERO IN 4 -2 DCC-M94 XT 3 (Hu5) Configuration port PSC-60A XT 2 230V AC 1 -1 50/60 Hz - Battery...
  • Page 33: Annex D.1(Mandatory) Wiring Diagram Of Turnstile Connection To Access Control System (Acs)

    Annex D.1 (mandatory) Wiring diagram of turnstile connection to access control system (ACS) TURNSTILE RELAY 1 RELAY 2 Figure D.1 – Wiring diagram of turnstile connection to ACS...
  • Page 34: Annex D.2(Mandatory) Wiring Diagram Of One Turnstile Connection To Fire Alarm System (Fas)

    Annex D.2 (mandatory) Wiring diagram of one turnstile connection to fire alarm system (FAS) (for entrance or exit) а) For entrance TURNSTILE Fire alarm system RELAY 1 b For exit Turnstile Fire alarm system RELAY 1 Figure D.2 – Wiring diagram of one turnstile connection to fire alarm system (FAS)
  • Page 35: Annex D.3(Mandatory) Wiring Diagram Of Two Turnstiles Connection To Fire Alarm System (Fas)

    Annex D.3 (mandatory) Wiring diagram of two turnstiles connection to fire alarm system (FAS) (for entrance) а) For entrance Turnstile: Fire alarm system RELAY 1 Turnstile: Figure D.3 – Wiring diagram of two turnstiles connection to fire alarm system (FAS)
  • Page 36: Annex D.4(Mandatory) Wiring Diagram Of Two Turnstiles Connection To Fire Alarm System (Fas)

    Annex D.4 (mandatory) Wiring diagram of two turnstiles connection to fire alarm system (FAS) (for exit) Turnstile b For exit Fire alarm system RELAY 1 Turnstile Figure D.4 – Wiring diagram of two turnstiles connection to fire alarm system (FAS)
  • Page 37: Annex D.5(Mandatory) Wiring Diagram Of Turnstile Connection To Control Panel

    Annex D.5 (mandatory) Wiring diagram of turnstile connection to control panel Turnstile Control Unit Figure D.5 – Wiring diagram of turnstile connection to control panel...
  • Page 38 Manufacturer: LLC TiSO-PRODUCTION 14, Promyslova Street, Kyiv, 02088, Ukraine Phone: +38 (044) 291-21-11 Tel./fax: +38 (044) 291-21-02 E-mail: sales@tiso.global www.tiso.global SERVICE CENTER e-mail: service1@tiso.global Our equipment meets the requirements of European standards: EN ISO 12100:2010, EN ISO 14118:2018, EN 60204-1:2018, EN ISO...