CLEARPOINT
®
Water separator
11.2 Disassembly work
The following requirements must be fulfilled to carry out disassembly work and preparatory work must be completed.
Tool
•
Screwdriver - Philip's head size 2.5
mm
1.
Open any bypass lines
1.
42 | 56
•
none
Preparatory work
Picture
Preconditions
Material
Description
1.
1. Close the shut-off valves upstream and downstream
of the separator of the system section in question,
depressurize the separator and secure the system
against unintended pressurization
2. If using the BEKOMAT
bottom section of the housing
For further information, see the attached installation and
operating instructions for the BEKOMAT
Installation and operation instructions
Protective equipment
•
Protective gloves (liquid-
resistant)
•
Safety glasses with side
protection (goggles)
•
Hearing protection
•
Class FFP 3 respirator
•
Safety shoes
, it must be separated from the
®
®