MAINTENANCE WORK ON CHASSIS AND ENGINE
1
0 0 1
2
0 0 2
Checking of the routing of the throttle cable
11.45
–
Remove the four screws
1
0 0 1
and lay it to one side.
2
0 0 2
Info
Protect the motorcycle and its attachments from damage by covering them.
Do not bend the cables and lines.
–
Remove the two screws
–
Place the handlebar support in the required position. Fit and tighten the two
screws
.
400223-10
Guideline
Screw, handlebar support
Info
Position the left and right handlebar supports evenly.
–
Position the handlebar.
Info
Make sure cables and wiring are positioned correctly.
–
Position the handlebar clamp. Fit and evenly tighten the four screws
Guideline
Screw, handlebar clamp
Info
Make sure the gap width is even.
–
The two throttle cables must run parallel behind the handlebar down to the frame.
They must be routed directly on the frame above the tank bearing to the carburetor.
600672-10
. Remove the handlebar clamp. Remove the handlebar
. Remove the handlebar support.
M10
40 Nm
(29.5 lbf ft)
M8
49
Loctite
®
243™
.
20 Nm
(14.8 lbf ft)