CAUTION You must use only the supplied rail kit and related mounting hardware.
To complete installation prerequisites:
1. Prepare the host system for the installation by obtaining access to the following items:
a. A host computer with the correct firmware, BIOS, and drivers
b. A functioning switch connected to a host computer
c. Tested, good cables for host connection that meet storage enclosure requirements
d. The provided power cords, which meet power specifications
2. Familiarize yourself with system configuration requirements and the storage enclosure components.
3. Obtain the following:
a. An anti-static wrist or ankle strap for handling static-sensitive components
b. A static-protected environment for temporary storage of the storage enclosure and the FRUs
c. A Torx screwdriver, 6-in length, with T10 and T20 bits
d. A flat-bladed screwdriver, 6-in length
e. A Philips screwdriver, 6-in length
f. A mechanical lift with sufficient clearance and capable of safely lifting the storage enclosure without
drive modules
4. Ensure the rack cabinet is suitable for use with the storage enclosure.
a. A rack cabinet capable of holding 2U or 5U form factors that meets all UL and IEC safety requirements,
leveled in all planes with respect to each other
b. Adequate clearance in front of the rack cabinet to install the provided rail kit
c. A maximum depth of 884mm (34.81 inches) from back of front post to maximum extremity, excluding
cabling and door closure considerations
d. A rack cabinet that causes a maximum back air pressure of 5 pascals (0.5mm water gauge)
e. A rack cabinet constructed to meet the installed weight capacity for the total number of storage
enclosures in the rack cabinet, based on the related maximum weight per enclosure
2U12
A maximum of 32kg (71 lb)
f. A maximum operating ambient temperature of 35°C (95°F)
5. Secure sufficient staff to assist with the installation. Minimum staff:
a. One qualified service technician for the complete installation procedure
b. One spotter to assist with the lift and to assist with the installation from the rear of the rack cabinet
c. A total of two people (2U) or three people (5U) to unpack the storage enclosure and move it onto the
mechanical lift
12 Chapter 3 Initial install preparations
2U24
A maximum of 30kg (60 lb)
5U84
A maximum of 130kg (287 lb)