Introduction; Schematic, Bill Of Materials, And Layout; Tps3431Evm Board - Top - Texas Instruments TPS3431EVM User Manual

Standard programmable watchdog timer with enable
Table of Contents

Advertisement

Introduction

1
Introduction
The TPS3431EVM is an evaluation module (EVM) for the TPS3431 standard watchdog timer. The EVM
has a supply voltage range of 1.8V to 6.5V, and offers connection headers for all device input and output
pins. Test points are provided to give the user additional connection points if needed for oscilloscope or
multimeter measurements.
1.1
Related Documentation
TPS3431 Standard Watchdog Timer with Enable data sheet,
TPS3431Q1 Standard Watchdog Timer with Enable data sheet,
Please see the TPS3431 and TPS3431Q1 datasheets for more detailed specifications, pin descriptions,
applications, and other information related to the devices. This user guide provides information related to
using the EVM.
2

Schematic, Bill of Materials, and Layout

This section provides a detailed description of the TPS3431EVM schematic, bill of materials (BOM), and
layout.
2
TPS3431EVM Standard Programmable Watchdog Timer with Enable
Figure 1. TPS3431EVM Board - Top
Copyright © 2018, Texas Instruments Incorporated
SBVSB66
SBVSB67
Submit Documentation Feedback
www.ti.com
SNVU614 – July 2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS3431EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents