Texas Instruments TPS3847085EVM-577 User Manual

Texas Instruments TPS3847085EVM-577 User Manual

Evaluation module

Advertisement

Quick Links

This user's guide describes the operational use of the TPS3847085EVM-577 evaluation module (EVM) as
a reference design for engineering demonstration and evaluation of the TPS3847085, an ultralow-power,
wide supply voltage, supervisory circuit. Included in this user's guide are setup instructions, a schematic
diagram, printed circuit board (PCB) layout drawings, and a bill of materials for the EVM.
...................................................................................................................
1
Introduction
......................................................................................................................
2
Hardware
2.1
Input and Output Connectors
2.2
Components
3
.....................................................................................................................
4
5
.....................................................................................................................
6
7
1
2
3
4
1
SBVU023 - August 2014
Submit Documentation Feedback
TPS3847085EVM-577 Evaluation Module
.....................................................................................
.........................................................................................................
...............................................................................................................
.................................................................................................................
...............................................................................................................
...............................................................................................................
...........................................................................................................
.......................................................................................................
.........................................................................................
...................................................................................
Copyright © 2014, Texas Instruments Incorporated
Contents
List of Figures
List of Tables
TPS3847085EVM-577 Evaluation Module
User's Guide
SBVU023 - August 2014
2
2
2
2
3
3
4
5
5
4
4
4
5
5
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS3847085EVM-577 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TPS3847085EVM-577

  • Page 1: Table Of Contents

    SBVU023 – August 2014 TPS3847085EVM-577 Evaluation Module This user’s guide describes the operational use of the TPS3847085EVM-577 evaluation module (EVM) as a reference design for engineering demonstration and evaluation of the TPS3847085, an ultralow-power, wide supply voltage, supervisory circuit. Included in this user’s guide are setup instructions, a schematic diagram, printed circuit board (PCB) layout drawings, and a bill of materials for the EVM.
  • Page 2 Introduction The Texas Instruments TPS3847085EVM-577 EVM helps design engineers to evaluate the operation and performance of the TPS3847xxx family of supervisors for possible use in their own circuit applications. This particular EVM configuration contains the TPS3847085 supervisor with an internal push-pull RESET output, in a 5-pin, DBV (SOT-23) package.
  • Page 3: Setup And Test

    Operation The TPS3847085EVM-577 is a fixed, single-rail monitor, and triggers a reset when its own supply rail VDD falls below the set threshold of 8.5 V. An internal push-pull RESET circuit eliminates the need for a pull-up resistor.
  • Page 4: Board Layout

    Board Layout www.ti.com Board Layout Figure 1. Top Silkscreen Figure 2. Top Layer Routing Figure 3. Bottom Layer Routing TPS3847085EVM-577 Evaluation Module SBVU023 – August 2014 Submit Documentation Feedback Copyright © 2014, Texas Instruments Incorporated...
  • Page 5: Schematic

    0.1 µF 1 MŸ 47 kŸ TPS3847 RESET RESET Installed Figure 4. TPS3847085EVM-577 Schematic Bill of Materials (1) (2) (3) Table 1. TPS3847085EVM-577 Bill of Materials Designator Value Description Size Part Number Manufacturer Capacitor, Ceramic Chip, 20V, X5R, 100 nF ±10%...
  • Page 6 ADDITIONAL TERMS AND CONDITIONS, WARNINGS, RESTRICTIONS, AND DISCLAIMERS FOR EVALUATION MODULES Texas Instruments Incorporated (TI) markets, sells, and loans all evaluation boards, kits, and/or modules (EVMs) pursuant to, and user expressly acknowledges, represents, and agrees, and takes sole responsibility and risk with respect to, the following: 1.
  • Page 7 RADIO FREQUENCY REGULATORY COMPLIANCE INFORMATION FOR EVALUATION MODULES Texas Instruments Incorporated (TI) evaluation boards, kits, and/or modules (EVMs) and/or accompanying hardware that is marketed, sold, or loaned to users may or may not be subject to radio frequency regulations in specific countries.
  • Page 8 Les types d'antenne non inclus dans cette liste, ou dont le gain est supérieur au gain maximal indiqué, sont strictement interdits pour l'exploitation de l'émetteur. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2014, Texas Instruments Incorporated spacer Important Notice for Users of EVMs Considered “Radio Frequency Products”...
  • Page 9 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.

Table of Contents