TPS3702CX33EVM-683 High accuracy window voltage
detector evaluation module for OV/UV monitoring
This user's guide describes the operational use of the
as a reference design for engineering demonstration and evaluation of the TPS3702CX33, an ultralow-
power, wide supply voltage, window voltage detector for over and undervoltage monitoring. Included in
this user's guide are setup instructions, a schematic diagram, printed circuit board (PCB) layout drawings,
and a bill of materials for the EVM.
Throughout this document, the terms EVM, demonstration kit, evaluation board, and evaluation module
are synonyms with the TPS3702CX33EVM-683 evaluation module.
...................................................................................................................
1
......................................................................................................................
2
2.1
2.2
3
.....................................................................................................................
4
...................................................................................................................
5
.....................................................................................................................
6
7
1
2
3
1
Trademarks
All trademarks are the property of their respective owners.
SBVU026A - January 2015 - Revised February 2019
Submit Documentation Feedback
.....................................................................................
.........................................................................................................
...............................................................................................................
...............................................................................................................
...........................................................................................................
.......................................................................................................
.......................................................................................
................................................................................
TPS3702CX33EVM-683 High accuracy window voltage detector evaluation
Copyright © 2015-2019, Texas Instruments Incorporated
SBVU026A - January 2015 - Revised February 2019
TPS3702CX33EVM-683 evaluation module
Contents
List of Figures
List of Tables
User's Guide
(EVM)
module for OV/UV monitoring
2
2
2
3
4
4
5
6
6
5
5
6
6
1
Need help?
Do you have a question about the TPS3702CX33EVM-683 and is the answer not in the manual?
Questions and answers