This user's guide describes the TPS3840EVM evaluation module (EVM). This guide contains the EVM
schematic, bill of materials (BOM), assembly drawing, and top and bottom board layouts.
1
Trademarks..............................................................................................................................................................................1
2
Introduction.............................................................................................................................................................................2
Documentation......................................................................................................................................................3
Applications........................................................................................................................................................3
3 Schematic, Bill of Materials, and Layout..............................................................................................................................
Schematic...................................................................................................................................................5
3.2 TPS3840EVM Bill of Materials...........................................................................................................................................
4 EVM Connectors.....................................................................................................................................................................
Points.................................................................................................................................................................9
Jumpers.....................................................................................................................................................................9
Operation....................................................................................................................................................10
)............................................................................................................................................................
5.3 Reset Output ( RESET )...................................................................................................................................................
6 Revision History...................................................................................................................................................................
Figure 2-1. TPS3840EVM Board Top..........................................................................................................................................
Schematic..........................................................................................................................................5
Figure 3-3. Component Placement-Bottom Assembly..............................................................................................................
Figure 3-4. Layout-Top..............................................................................................................................................................
Layout-Bottom.........................................................................................................................................................7
Layer...................................................................................................................................................................8
Figure 3-7. Bottom Layer.............................................................................................................................................................
Mask........................................................................................................................................................8
Figure 5-2. TPS3840EVM RESET Deasserted Due to MR Pulled High, With Delay t
Figure 5-3. TPS3840EVM Startup Delay Time (t
Figure 5-4. TPS3840EVM Glitch Immunity................................................................................................................................
Figure 5-6. TPS3840EVM RESET Delay Time (t
Figure 5-7. TPS3840EVM RESET Delay Time (t
BOM............................................................................................................................................................................6
Table 4-1. Test Points..................................................................................................................................................................
Jumpers.............................................................................................................................................9

1 Trademarks

All trademarks are the property of their respective owners.
SNVU611A - DECEMBER 2018 - REVISED MAY 2021
Submit Document Feedback
ABSTRACT

Table of Contents

Placement....................................................................................................................................7
VDD..............................................................................................................................................10
via CT)......................................................................................................
List of Figures
Bottom.....................................................................................................................................3
Assembly....................................................................................................................7
List of Tables
Voltages......................................................................................................10
Copyright © 2021 Texas Instruments Incorporated
Low.........................................................................................10
, C
D
Floating........................................................
Tied to GND Through 0.01-µF Capacitor.....................................
Floating.........................................................................................12
TPS3840EVM Voltage Supervisor User Guide
Table of Contents
Floating........................................
T
4
6
9
10
11
11
12
2
7
7
8
10
11
11
12
12
9
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS3840EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TPS3840EVM

  • Page 1: Table Of Contents

    Table of Contents User’s Guide TPS3840EVM Voltage Supervisor User Guide ABSTRACT This user’s guide describes the TPS3840EVM evaluation module (EVM). This guide contains the EVM schematic, bill of materials (BOM), assembly drawing, and top and bottom board layouts. Table of Contents Trademarks....................................1 Introduction.....................................2...
  • Page 2: Introduction

    2 Introduction The TPS3840EVM is an evaluation module (EVM) for the TPS3840 voltage supervisor. The TPS3840EVM can be used with any TPS3840 device variant but please note that if using the push-pull variants (TPS3840PLXX or TPS3840PHXX), the shunt on J2 must be removed as push-pull devices do not use a pull-up resistor so R1 must be disconnected.
  • Page 3: Related Documentation

    Introduction Figure 2-2. TPS3840EVM Board Bottom 2.1 Related Documentation TPS3840 Nano Power, High Input Voltage Supervisor with MR and programmable delay data sheet, SBVS085 2.2 TPS3840 Applications • Grid Infrastructure (Circuit Breakers, Smart Meters, monitor and protection equipment) •...
  • Page 4: Schematic, Bill Of Materials, And Layout

    Schematic, Bill of Materials, and Layout www.ti.com 3 Schematic, Bill of Materials, and Layout This section provides a detailed description of the TPS3840EVM schematic, bill of materials (BOM), and layout. TPS3840EVM Voltage Supervisor User Guide SNVU611A – DECEMBER 2018 – REVISED MAY 2021 Submit Document Feedback Copyright ©...
  • Page 5: Tps3840Evm Schematic

    /RES ET_DL RES ET VDD_DL TP 4 /MR_DL TP 5 GND_DL TP S 3840DL29DBVR 0.01uF Figure 3-1. TPS3840EVM Schematic SNVU611A – DECEMBER 2018 – REVISED MAY 2021 TPS3840EVM Voltage Supervisor User Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 6: Tps3840Evm Bill Of Materials

    Schematic, Bill of Materials, and Layout www.ti.com 3.2 TPS3840EVM Bill of Materials Table 3-1. BOM PACKAGE DESIGNATOR QUANTITY VALUE DESCRIPTION PART NUMBER MANUFACTURER REFERENCE !PCB Printed Circuit Board LP015 1 µF CAP, CERM, 1 µF, 16 V, ± 10%, X5R, 0603...
  • Page 7: Layout And Component Placement

    EVM. Figure 3-3. Component Placement—Bottom Figure 3-2. Component Placement—Top Assembly Assembly Figure 3-4. Layout—Top Figure 3-5. Layout—Bottom SNVU611A – DECEMBER 2018 – REVISED MAY 2021 TPS3840EVM Voltage Supervisor User Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 8: Figure 3-6. Top Layer

    Schematic, Bill of Materials, and Layout www.ti.com Figure 3-6. Top Layer Figure 3-7. Bottom Layer Figure 3-8. Top Solder Mask TPS3840EVM Voltage Supervisor User Guide SNVU611A – DECEMBER 2018 – REVISED MAY 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 9: Evm Connectors

    Connection to GND pin. Allows user to connect to the ground plane. 4.2 EVM Jumpers Table 4-2 lists the jumpers on the TPS3840EVM. As ordered, the EVM will have five jumpers installed. Table 4-2. List of Onboard Jumpers Jumper Default Connection Description Both pins on J1 are connected together.
  • Page 10: Evm Setup And Operation

    EVM Setup and Operation www.ti.com 5 EVM Setup and Operation This section describes the functionality and operation of the TPS3840EVM. The user should read the TPS3840 datasheet for electrical characteristics of the device. 5.1 Input Power (V The V supply is connected through the J1 header on board. Both pins of jumper J1 are connected together so power can be applied to either pin.
  • Page 11: Reset Output ( Reset )

    Figure 5-4. TPS3840EVM Glitch Immunity 5.3 Reset Output ( RESET ) The TPS3840EVM comes populated with TPS3840DL29 device variant which has open-drain, active-low output topology for the RESET pin. The other device variants provide different output topolgies and can be used on this EVM.
  • Page 12: Revision History

    ) = 5.8 ms Reset Delay (t )= 654 ms RESET RESET Figure 5-5. TPS3840EVM RESET Delay Time (t Figure 5-6. TPS3840EVM RESET Delay Time (t with C Tied to GND Through 1-µF Capacitor with C Tied to GND Through 0.01-µF Capacitor Reset Delay (t ) = 22 µs...
  • Page 13 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 14 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 15 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 16 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 17 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 18 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products.IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2021, Texas Instruments Incorporated...

Table of Contents