Download Print this page
Texas Instruments TPS3842EVM User Manual

Texas Instruments TPS3842EVM User Manual

Evaluation module

Advertisement

Quick Links

www.ti.com
EVM User's Guide: TPS3842EVM
TPS3842 Evaluation Module
Description
The TPS3842EVM is an evaluation module (EVM)
for the TPS3842-Q1 and TPS3842 family of voltage
supervisors. The purpose of the this EVM is to provide
a sample design and test point for all input and output
pins of the TPS3842 and TPS3842-Q1 device to
capture measurements and gain familiarity with the
device.
SLVUCS8 – APRIL 2024
Submit Document Feedback
TI Information - Selective Disclosure
TI Information - Selective Disclosure
Features
Wide supply voltage range: 1.9V to 42V
VDD, SENSE, and RESET are rated to 42V
Low quiescent current: 850nA (typical)
High threshold accuracy: 0.5% (typical)
Capacitor programmable adjustable delay time
with CTR pin
Capacitor programmable deglitch delay time with
CTS pin
TPS3842EVM Board - Top
Copyright © 2024 Texas Instruments Incorporated
Description
TPS3842 Evaluation Module
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the TPS3842EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TPS3842EVM

  • Page 1 Description EVM User's Guide: TPS3842EVM TPS3842 Evaluation Module Description Features The TPS3842EVM is an evaluation module (EVM) • Wide supply voltage range: 1.9V to 42V for the TPS3842-Q1 and TPS3842 family of voltage • VDD, SENSE, and RESET are rated to 42V supervisors.
  • Page 2 The TPS3842EVM circuit board comes preinstalled with the TPS3842A011DRLR device for full functionality testing of the TPS3842 family of devices. The TPS3842EVM circuit board comes packaged in a moisture barrier bag inside of antistatic foam layered cardboard box. Also contained in the box is the EVM literature disclaimer.
  • Page 3 Allows user to apply a desired external voltage to sense pin decoupled from VDD. 2.1.2 EVM Jumpers Table 2-2 lists the jumpers on the TPS3842EVM. As ordered, the EVM has twelve jumpers installed. Table 2-2. Jumpers Jumper Default Connection Description Pin7 and 8 Selectable jumper to pick hysteresis level.
  • Page 4 Hardware www.ti.com 2.2 EVM Setup and Operation This section describes the functionality and operation of the TPS3842EVM. The user needs to read the TPS3842 data sheet (SNVSCK5) for electrical characteristics of the device. 2.2.1 Capacitor Sense Time Delay The TPS3842 family of devices contain an adjustable reset time delay pin that control the time with which the reset pins assert after the pins reach the invalid condition.
  • Page 5 TI Information - Selective Disclosure www.ti.com Hardware Design Files 3 Hardware Design Files 3.1 TPS3842EVM Schematic Figure 3-1. TPS3842EVM Schematic SLVUCS8 – APRIL 2024 TPS3842 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 6 Figure 3-7 Figure 3-8 show the top and bottom solder masks of the EVM. Figure 3-2. Top Overlay Figure 3-3. Bottom Overlay TPS3842 Evaluation Module SLVUCS8 – APRIL 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 7 TI Information - Selective Disclosure www.ti.com Hardware Design Files Figure 3-4. Top Layout Figure 3-5. Top Layer SLVUCS8 – APRIL 2024 TPS3842 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 8 TI Information - Selective Disclosure Hardware Design Files www.ti.com Figure 3-6. Bottom Layer Figure 3-7. Top Solder Mask TPS3842 Evaluation Module SLVUCS8 – APRIL 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 9 TI Information - Selective Disclosure www.ti.com Hardware Design Files Figure 3-8. Bottom Solder Mask SLVUCS8 – APRIL 2024 TPS3842 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 10 R4 (DNI), Ra (DNI), Rb 0402 (DNI) 1.2M 0402 ERJ-2GEJ125X Yageo 43 K 0402 ERJ-2RKF4302X Panasonic 150 K 0402 ERJ-2RKF1503X Yageo 220 K 0402 RC0402FR-07220KL Yageo TPS3842 Evaluation Module SLVUCS8 – APRIL 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 11 Keystone Electronics TP5, TP6, TP8, TP9, Test Point, 1 Position SMD, RoHS, Tape and 5019 Keystone Electronics TP10, TP11 Reel TPS3842A011DRLR TPS3842A011DRLR Texas Instruments SLVUCS8 – APRIL 2024 TPS3842 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12 Please see the TPS3842 data sheet for more detailed specifications, pin descriptions, applications, and other information related to the device. This user's guide provides information related to using the EVM. TPS3842 Evaluation Module SLVUCS8 – APRIL 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 13 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 14 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 15 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 16 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 17 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 18 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...