Installation Of The Monitoring Device; Mechanical Installation - Salicru EQUINOX EQX2 3001-HSX User Manual

Single-phase hybrid solar inverters connected to the grid
Table of Contents

Advertisement

Available languages

Available languages

Fig. 58. AC BACK-UP connection.
Place the housing in its position and secure it using the
8.
4 screws included in the package.
Insert the relevant AC circuit breakers in between, as shown
9.
in the table below:
Circuit breaker (*)
Model
Without
With batt.
batt.
EQX2
2P 20 A C
2P 30 A C
3001-HSX
curve
curve
EQX2
2P 25 A C
2P 40 A C
4002-HSX
curve
curve
EQX2
2P 30 A C
2P 50 A C
5002-HSX
curve
curve
EQX2
2P 40 A C
6002-HSX
curve
2P 63 A C
curve
EQX2
2P 50 A C
8002-HSX
curve
Tab. 17. AC circuit breakers.
(*)
If your system has batteries, the capacity of the input
circuit breakers must be higher than it is in systems without
batteries, as it may be necessary to charge the batteries and power
the loads simultaneously via the AC mains input.
Connect the other end of the bundle to the AC circuit breaker
10.
for the critical BACK-UP loads.
Fig. 59. Complete diagram of the AC BACK-UP connections.
USER MANUAL
Previous
Over-
Dif-
fuse.
voltage
ferential
Max.
protec-
relay
value
tion
(1/phase)
2P 25 A
30 mA
Type II
Type B
40 kA
125 A gL
230 V TT
2P 32 A
30 mA
Type B
5.4. INSTALLATION OF THE MONITORING
DEVICE.

5.4.1. Mechanical installation.

The single-phase inverter of the EQX2 series supports WiFi and
RS485 communications.
Plug the WiFi module into the USB (WiFi) port located at the
bottom of the inverter (as shown in Fig. 60). A "click" indicates that
the module has been fitted correctly.
Fig. 60. Communication device connection (WiFi antenna).
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
77