Wiring Diagram - Salicru EQUINOX EQX2 3001-HSX User Manual

Single-phase hybrid solar inverters connected to the grid
Table of Contents

Advertisement

Available languages

Available languages

Do not use terminals of different manufacturers or of
different types, other than those included in the acces-
sory pack. SALICRU shall not be held liable for any form
Attention
of damage caused by the use of unauthorised terminals.

5.3.1. Wiring diagram.

This diagram shows the structure and composition of the wiring of
hybrid inverters in the
project. The installation and wiring must comply with local stand-
ards.
ICP
Fig. 35. Standard wiring diagram.
70
EQX2-HSX
series, in relation to the actual
CT
ID
Meter
IGA
ID
Fus.
MCB
SPD
PV
Moisture and dust can damage the inverter; check that
the cable gland is tight enough during installation.
The warranty will be void if the inverter is damaged as
Attention
a result of an improperly installed cable gland.
PIAs
Inverter
Fus.
MCB
SPD
Batt.
ID
PIAs
Fus.
Back-up
MCB
SPD
Legend abbreviations:
IPC
– Power control switch.
IGA
– Main circuit breaker.
ID
– Differential switch.
MCB
– Magnetic Circuit Breaker.
Fus.
– Fuses.
SPD
– Surge Protection Device.
PIA
– Small circuit breaker.
PV
– Photovoltaic panel.
Batt. – Batteries.
BMS
– Communication system with the Battery
Management System.
Meter
– Communication system with the Meter.
SALICRU

Advertisement

Chapters

Table of Contents
loading

Table of Contents