Toshiba HWT-601XWHM3W-ETR Service Manual page 215

Air to water heat pump
Table of Contents

Advertisement

Exchange
No.
parts name
PMV coil
1. Detachment
1) Following to work of Detachment of
2) Cut the binding band (4 positions) on the back
surface
3) Pull the connector for PMV coil out of CDB
4) Remove the coil from the PMV body by rotating the coil
(about 45°) while drawing the coil upward.
2. Attachment
Attach the PMV coil in the reverse process of
"1. Detachment"
1) Fix the coil positioning protrusions securely in the
concavities of the PMV body.
(Fix the coil in the direction where lead wire comes out
at the body's left diagonally behind.)
2) Attach the PMV coil connector to the CDB P.C. board.
4-way
1. Detachment
valve coil
1)Following to work Detachment ④
2)Cut the binding band (4 positions) on the back surface.
3)Pull the connector for 4-way valve coil out of CDB
P.C.board.
4)Remove the 4-way valve coil.(M5 screw)
2. Attachment
Attachment the 4-way valve coil in the reverse process
of "1.Detachment"
*Fix the 4-way valve coil with its lead wire upward.
Work procedure
.
PMV coil
4-way valve coil lead wire
(Upper side)
Cut the binding band
214
R
e
m
a
k r
s
Cut the
Cut the
Cut the
binding band
binding band
binding band
Cut the binding band
PMV coil connector
Cut the binding band
4-way valve coil connector

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents