Toshiba HWT-601XWHM3W-ETR Service Manual page 173

Air to water heat pump
Table of Contents

Advertisement

To start the operation
1
Press the [
] button and the [
seconds or longer on the top screen to display the "FIELD SETTING
MENU".
2
Press the [
FIELD SETTING MENU, then press the [
3
Press the [
button.
• Check the total days for Floor drying operation, then press [
The
mark and
4
Start the heating operation on the top screen.
• Then ZONE1 mark blinks during Floor drying operation and lapsed days
are displayed.
• If some abnormalities occur during Floor drying operation, the System stops and Alarm history screen is
displayed.
• After heating operation is stopped by operating the remote controller during Floor drying operation, if heating
operation is again started within 30 minutes, Floor drying operation is started from the time of stopping.
] / [
] button to select "Floor drying" on the
] button to select the ON, then press the [
mark appears on the Top screen.
] button at same time for 4
] button.
172
FIELD SETTING MENU(1/2)
Forced defrosting
Information input
Alarm history
]
] button.
FIX
ZONE1
HEAT/COOL
Test mode
Floor drying
SET
Floor drying
ON
OFF
MON
HOT WATER
HOT WATER