www.ti.com
Designator
Quantity
J6
1
J7
1
J8, J10
2
J9
1
J11
1
L1
1
LBL1
1
MP1, MP2, MP3, MP4,
5
MP5
MP6, MP7, MP8, MP9,
5
MP10
Q1_1, Q1_2, Q1_3, Q1_4,
8
Q1_5, Q1_6, Q1_7, Q1_8
Q2
1
Q3
1
R1_1, R1_2, R1_3, R1_4,
8
R1_5, R1_6, R1_7, R1_8
SLLU357 – MAY 2023
Submit Document Feedback
Value
Description
DC POWER JACK, R/A,
TH
Header (Shrouded), 5.08
mm, 2x1, Tin, R/A, TH
Header, 100mil, 3x1, Gold,
TH
Header, 100mil, 2x1, Gold,
TH
Inductor, Shielded Drum
47uH
Core, Metal Composite, 47
uH, 0.74 A, 0.5 ohm, SMD
Thermal Transfer Printable
Labels, 0.650" W x 0.200"
H - 10,000 per roll
Round Standoff Threaded
M2.5x0.45 Steel 0.276"
(7.00mm)
M2.5x0.45 Pan Head
Machine Screw Slotted
Drive Steel
Transistor, NPN, 60 V, 0.9
60 V
A, SOT-23
MOSFET, N-CH, 100 V,
100V
50 A, DQG0008A (VSON-
CLIP-8)
MOSFET, N-CH, 50 V, 0.22
50V
A, SOT-23
Surface Mount MELF
Resistor, 1.21 kohm, 200
1.21k
V, 250 mW, 1%, Thin
Film ,AEC-Q200
Copyright © 2023 Texas Instruments Incorporated
Part Number
Package
Reference
DC POWER
PJ-102AH
JACK, R/A, TH
Header, 5.08 mm,
1757242
2x1, R/A, TH
3x1 Header
TSW-103-07-G-S
2x1 Header
TSW-102-07-G-S
HDR2
1757019
SMD
7447785147
PCB Label 0.650
THT-14-423-10
x 0.200 inch
SPACER_RADIA
9774070151R
L_M2
SCREW_M2.5
29300
SOT-23
PBSS4160T
DQG0008A
CSD19537Q3
SOT-23
BSS138
0204
SMM02040C1211FB300
Hardware Design Files
Manufacturer
Alternate
PartNumber
Manufacturer
CUI Inc.
Phoenix Contact
Samtec
Samtec
Phoenix Contact
Wurth Elektronik
Brady
Wurth Electronics
Keystone
Electronics
NXP
Semiconductor
Texas
None
Instruments
Fairchild
None
Semiconductor
Vishay
BOOSTXL-IOLINKM-8 EVM User's Guide
Alternate
49
Need help?
Do you have a question about the BoosterPack BOOSTXL-IOLINKM-8 EVM and is the answer not in the manual?
Questions and answers