2.3 BoosterPack Pinout Headers

The BOOSTXL-IOLINKM-8 BoosterPack requires both sets of BoosterPack XL connectors (J1/J3, J2/J4) and
(J5/J7, J6/J8), and uses most of the signals available from the LaunchPad for the application. The eight
standard IO-LINK Port 5-pin M12 connectors must be mounted in a manner that eliminates the ability to stack
another BoosterPack board on top of the BOOSTXL-IOLINKM-8 board. As a result, the standard BoosterPack
XL connectors, with both a socket portion on the bottom of the board and a pin portion on top of the board,
have been replaced with a surface mount socket header type that allows the BoosterPack to mate with the
LaunchPad, but removes the top side pins that conflict with the M12 connectors. The majority of these signals
have also been brought out to test points located on the perimeter of the Boosterpack to maintain access to
these signals during testing.
GND
RX4
TX7
RX5
TX3
TX4
RX6
TX5
EN_L+2
GND
EN1
DI_nCE
EN2
EN5
DI_SOP
EN3
EN4
DI_nLD
14
BOOSTXL-IOLINKM-8 EVM User's Guide
Figure 2-2
shows the header pinout as viewed from the bottom side of the board.
J2
J4
20
40
L_SEH
19
39
L_SEL
18
38
H_FAULT
17
37
16
36
L_FAULT
15
35
14
34
13
33
RX1
12
32
RX2
11
31
RX3
J8
J6
60
80
FAULT1
59
79
FAULT2
58
78
FAULT3
57
77
FAULT4
56
76
FAULT5
55
75
FAULT6
54
74
FAULT7
53
73
FAULT8
52
72
EN_L+7
51
71
EN_L+8
Figure 2-2. LaunchPad-BoosterPack Pinout
Copyright © 2023 Texas Instruments Incorporated
+5V
GND
L_CS_BUF
+5V
GND
EN8
EN7
EN6
EN_L+3
EN_L+4
EN_L+5
EN_L+6
Bottom view
www.ti.com
J3 J1
21 1
+3V3
22 2
24V_CS_BUF
23 3
H_SEH
24 4
H_SEL
25 5
TX2
26 6
H_CS_BUF
27 7
TX6
28 8
TX8
29 9
GPIO_SCL
30 10
GPIO_SDA
J7 J5
61 41
+3V3
62 42
63 43
TX1
64 44
RX8
65 45
EN_L+1
66 46
67 47
DI_SCK
68 48
RX7
69 49
70 50
SLLU357 – MAY 2023
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BoosterPack BOOSTXL-IOLINKM-8 EVM and is the answer not in the manual?

Questions and answers

Table of Contents