9.3

Checklist for commissioning

Customer:
Machine number:
Your project:
Commissioning date:
Test point
1
Operating manual and its appendices read and
understood
2
The factory default operating parameters are
adequate for the application, the substrate being
fed is appropriate
3
System components professionally mounted
according to the operating manuals of the
components; control unit professionally mounted
on a straight, dry wall / a suitable holding frame.
4
Secure position of terminal and fastening screws
checked and tightened again, where necessary
5
Macerator installed correctly as described in the
operating manual and ready for operation
6
Power supply and any external control units
properly connected
7
Control unit closed, keyholder duty assigned
8
Function check according to chapter 5.1.1 and
5.1.4 carried out without faults
9
Data entry permissions discussed and password
changed and safely stored according to chapter
5.1.2.
10
Actual current consumption of macerator tested,
current consumption is acceptable (i.e. constantly
lies below the stored limit for reversing as
described in chapter 5.1.5)
11
If required, parameters for reversing adjusted as
described in chapter 5.1.5
12
UV cover, if applicable, closed during operation
13
Maintenance and inspection intervals organized
for the machine
74
This checklist can be used as an additional aid when
commissioning a macerator with a STE-RS control unit.
It is not a substitute for careful reading of the operating manual
before commissioning the unit.
www.boerger.de / www.boerger.com
Börger order confirmation no.:
Type code:
Order number:
Delivery date:
Carried out by:
(date / signature)
Appendix
Checked by:
(date / signature)