Figure 3-20 Installing expansion bolts (unit: mm)
1.
2.
3.
4.
Step 3 Use a pallet truck to move the cabinet to the installation position.
Step 4 Use eight M12x60 expansion bolts to secure the cabinet to the expansion bolt holes on the
ground and tighten the expansion bolts, as shown in
Issue 06 (2020-01-10)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.