Fujitsu F2MC-16L Hardware Manual page 26

Emulator
Hide thumbs Also See for F2MC-16L:
Table of Contents

Advertisement

CHAPTER 1 PRODUCT HANDLING AND SPECIFICATIONS
I Operation outline
Figure 1.9-2 "Timing chart of the power-on debug operation" is a timing chart of the power-on
debug operation.
❍ Operation timing
Detection of power-off:
Power-off status of user system power supply voltage (UV
When the user power supply voltage becomes equal to or less than the power-off detection
level, the emulator outputs an L-level signal to the PLEV pin of the evaluation MCU to stop
the MCU and prevent its malfunction.
(See (1) in Figure 1.9-2 "Timing chart of the power-on debug operation".)
Detection of power-on:
The power-on status of user system power supply voltage (UV
Power-on of the user power supply (UVcc) is detected.
The function checks that a voltage higher than the power-off detection level is held for the
operation stabilization time (about 2 ms) of the evaluation MCU after the voltage is detected
as being higher than the power-off detection level.
(See (2) in Figure 1.9-2 "Timing chart of the power-on debug operation".)
After the operation stabilization time, the emulator outputs an H-level signal to the PLEV pin
of the evaluation MCU and releases the user reset input for program execution.
(See (3) in Figure 1.9-2 "Timing chart of the power-on debug operation".)
Figure 1.9-2 Timing chart of the power-on debug operation
UV
CC
Power-off detection level
PLEV
Notes:
Setting of the power-off detection level must take the characteristics of the user power
supply (UV
If using the power-on debug function, generally set the voltage about 5% above the minimum
operation assurance voltage of the evaluation MCU. If not using the power-on debug
function, set the voltage to the minimum operation assurance voltage of the evaluation MCU.
While the PLEV pin level is low, the emulator functions (trace, event, and other) are disabled
because the evaluation MCU blocks the emulator connection to prevent the emulator from
malfunctioning.
12
(1)
) into consideration.
CC
Get other manuals https://www.bkmanuals.com
) is detected.
CC
) is detected.
CC
(2)
(3)
Operation stabilization
time (2 ms)

Advertisement

Table of Contents
loading

This manual is also suitable for:

F2mc-16lx

Table of Contents