www.ti.com
F
= 1 MHz
I
SW
OUT
Figure 3-11. Infrared Thermal Image V
V
OUT
3.3 Bode Plot
Figure 3-13
provides the bode plot at V
a typical capacitance versus voltage curve for a 47-µF, 16-V, X6S output capacitor to highlight the effective
capacitance value of a ceramic. See component details in
Figure 3-13. Bode Plot With Four 47-µF, 16-V Output Capacitors (110 µF Effective at 5 VDC, 25°C)
SLVUCN1 – JANUARY 2023
Submit Document Feedback
= 8 A
P
= 3.27 W
DIS
= 12 V,
IN
= 3.3 V
= 24 V, V
IN
OUT
Copyright © 2023 Texas Instruments Incorporated
F
= 1 MHz
SW
Figure 3-12. Infrared Thermal Image V
V
OUT
= 5 V, F
= 1 MHz, and I
SW
Bill of
Materials.
TLVM13610EVM Buck Regulator Evaluation Module
Test Data and Performance Curves
I
= 8 A
P
= 3.84 W
OUT
DIS
= 24 V,
IN
= 3.3 V
= 8 A.
Figure 3-14
shows
OUT
9
Need help?
Do you have a question about the TLVM13610EVM and is the answer not in the manual?