Texas Instruments TLV751-EVM User Manual

Texas Instruments TLV751-EVM User Manual

Hide thumbs Also See for TLV751-EVM:

Advertisement

Quick Links

This user's guide describes the operational use of the TLV751-EVM evaluation module (EVM) as a
reference design for engineering demonstration and evaluation of the TLV75101DSQ, a dual, high-
accuracy, adjustable linear regulator (LDO). Included in this user's guide are setup and operating
instructions, thermal and layout guidelines, a printed circuit board (PCB) layout, a schematic diagram, and
a bill of materials (BOM).
Throughout this document, the terms demonstration kit, evaluation board, and evaluation module are
synonymous with the TLV751-EVM.
Table 1
lists the related documentation available through the Texas Instruments web site at www.ti.com.
SBVU057 – December 2019
Submit Documentation Feedback

TLV751-EVM Evaluation Module

Figure 1. TLV751-EVM Evaluation Module
Table 1. Related Documentation
DEVICE
TLV751
Copyright © 2019, Texas Instruments Incorporated
LITERATURE NUMBER
SBVS385
TLV751-EVM Evaluation Module
User's Guide
SBVU057 – December 2019
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLV751-EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TLV751-EVM

  • Page 1: Tlv751-Evm Evaluation Module

    TLV751-EVM Evaluation Module Figure 1. TLV751-EVM Evaluation Module This user’s guide describes the operational use of the TLV751-EVM evaluation module (EVM) as a reference design for engineering demonstration and evaluation of the TLV75101DSQ, a dual, high- accuracy, adjustable linear regulator (LDO). Included in this user’s guide are setup and operating instructions, thermal and layout guidelines, a printed circuit board (PCB) layout, a schematic diagram, and a bill of materials (BOM).
  • Page 2: Table Of Contents

    Bottom Layer Routing ....................TLV751-EVM Schematic List of Tables ..................... Related Documentation ......................TLV751-EVM BOM Trademarks All trademarks are the property of their respective owners. TLV751-EVM Evaluation Module SBVU057 – December 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 3: Introduction

    Introduction Texas Instruments' TLV751-EVM helps design engineers evaluate the operation and performance of the TLV751 family of linear regulators for possible use in their own circuit application. This particular EVM configuration contains a single high-accuracy, small size, dual-input linear regulator for a wide range of applications.
  • Page 4: Evm Setup

    EVM Setup www.ti.com EVM Setup This section describes how to properly connect and set up the TLV751-EVM, including the jumpers and connectors on the EVM board. Inputs/Outputs Connectors and Jumper Descriptions 2.1.1 J1 – OUT1_S Regulated output voltage one sense 2.1.2...
  • Page 5: Soldering Guidelines

    To avoid damaging the integrated circuit (IC), use a hot-air system for any solder rework to modify the EVM for the purpose of repair or other application reasons. SBVU057 – December 2019 TLV751-EVM Evaluation Module Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 6: Equipment Connection

    2. Enable the outputs by jumping J11 (the EN1 pin) to VIN1 and J14 (the EN2 pin) to VIN2. 3. Vary the respective loads and input voltages, as necessary, for test purposes. TLV751-EVM Evaluation Module SBVU057 – December 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 7: Pcb Layout

    PCB layout for this EVM. Figure 2. Assembly Layer Figure 3. Top Layer Routing Figure 4. First Middle Layer Figure 5. Second Middle Layer SBVU057 – December 2019 TLV751-EVM Evaluation Module Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 8 PCB Layout www.ti.com Figure 6. Bottom Layer Routing TLV751-EVM Evaluation Module SBVU057 – December 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 9: Schematic

    Schematic www.ti.com Schematic Figure 7 shows this schematic for the EVM. Figure 7. TLV751-EVM Schematic SBVU057 – December 2019 TLV751-EVM Evaluation Module Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 10: Bill Of Materials

    These assemblies must comply with workmanship standards IPC-A-610 Class 2. Unless otherwise noted in the Alternate Part Number or Alternate Manufacturer columns, all parts can be substituted with equivalents. TLV751-EVM Evaluation Module SBVU057 – December 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 11 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 12 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 13 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 14 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 15 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 16 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 17 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TLV751-EVM...

This manual is also suitable for:

Tlv75101dsq

Table of Contents