Advertisement

Quick Links

www.ti.com
User's Guide
TLV3602EVM User's Guide
The TLV3602EVM is an evaluation board designed to evaluate the high-speed TLV3602 comparator. The PCB
footprint for the comparator accommodates the 8-pin VSSOP TLV3602 DGK to be soldered on the board.
1
Introduction.............................................................................................................................................................................2
2
Features...................................................................................................................................................................................3
Specifications.................................................................................................................................................................4
Equipment.................................................................................................................................................4
Procedure............................................................................................................................................................5
Setup.............................................................................................................................................................................8
5.1 Supply Voltage...................................................................................................................................................................
5.2 Inputs.................................................................................................................................................................................
5.3
Outputs...............................................................................................................................................................................9
5.4
Hysteresis...........................................................................................................................................................................9
6 Layout Guidelines.................................................................................................................................................................
7
Schematic..............................................................................................................................................................................12
8 Bill of Materials.....................................................................................................................................................................
Figure 1-1. TLV3602EVM Board Top View..................................................................................................................................
Figure 2-1. Block Diagram Per Channel......................................................................................................................................
Figure 4-1. TLV3602EVM Quick Start Setup...............................................................................................................................
Figure 4-2. Propagation Delay Rise Portion................................................................................................................................
Figure 5-1. TLV3602EVM Supply Voltage Connection................................................................................................................
Figure 5-3. Input Side Schematic................................................................................................................................................
Figure 5-4. Output Side Block Diagram.......................................................................................................................................
Figure 6-1. Layers......................................................................................................................................................................
Schematic.........................................................................................................................................12
Table 3-1. TLV3602EVM SMA and Test Point to DUT Pin Mapping............................................................................................
Trademarks
All trademarks are the property of their respective owners.
SNOU193 - MAY 2022
Submit Document Feedback
ABSTRACT

Table of Contents

List of Figures
Portion..................................................................................................................................7
Schematic..................................................................................................................8
A........................................................................................................10
B........................................................................................................10
List of Tables
Materials...................................................................................................................................13
Copyright © 2022 Texas Instruments Incorporated
Table of Contents
8
8
11
13
2
3
6
7
8
9
9
11
4
TLV3602EVM User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLV3602EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TLV3602EVM

  • Page 1: Table Of Contents

    User’s Guide TLV3602EVM User's Guide ABSTRACT The TLV3602EVM is an evaluation board designed to evaluate the high-speed TLV3602 comparator. The PCB footprint for the comparator accommodates the 8-pin VSSOP TLV3602 DGK to be soldered on the board. Table of Contents Introduction.....................................2...
  • Page 2: Introduction

    The TLV3602EVM is an evaluation board designed to evaluate the high-speed TLV3602 comparator. The TLV3602EVM has layout options intended to make it simple to evaluate timing performance with different measurement tools. The output of the TLV3602 allows for direct connection to a 50 Ω terminated oscilloscope.
  • Page 3: Features

    8-pin DGK VSSOP Package ¡ INA+ Sense INA+ Attenuation Option for OUTA LVDS ¢ TLV3602A – Termination INA- £ Figure 2-1. Block Diagram Per Channel SNOU193 – MAY 2022 TLV3602EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 4: Evm Specifications

    Supply Range (VCC - VEE): 2.4 V to 5.5 V • Input Common Mode Range: (Vee -200 mV) to (VCC + 200 mV) Table 3-1. TLV3602EVM SMA and Test Point to DUT Pin Mapping TLV3602EVM CONNECTIONS SMA J3: INA+ INA+ (Pin 1)
  • Page 5: Quick Start Procedure

    8. Enable the power supply and the signal generator. 9. Verify the total supply current is < 50 mA. 10. Monitor and verify the input from INA+SENSE. 11. Monitor and verify OUTA. SNOU193 – MAY 2022 TLV3602EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 6: Figure 4-1. Tlv3602Evm Quick Start Setup

    Note: The INA+ Sense (J6) cable and OUTA (J8) cable should be length matched +2.5V DC Power Supply -2.5V Figure 4-1. TLV3602EVM Quick Start Setup TLV3602EVM User's Guide SNOU193 – MAY 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 7: Figure 4-2. Propagation Delay Rise Portion

    Figure 4-3 was measured to be 2.155 ns. Input Output Figure 4-2. Propagation Delay Rise Portion Output Input Figure 4-3. Propagation Delay Fall Portion SNOU193 – MAY 2022 TLV3602EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 8: Board Setup

    5 Board Setup 5.1 Supply Voltage The TLV3602EVM operates using a V (Supply Voltage, or VCC - VEE) from 2.4 V to 5.5 V. Connect VCC to TP1, VEE to TP2, and GND to either TP3 or TP4. If using single supply configuration, connect system ground to GND and VEE.
  • Page 9: Outputs

    Figure 5-4. Output Side Block Diagram 5.4 Hysteresis The TLV3602EVM is able to support external hysteresis for each TLV3602 non-inverting input. When configuring the EVM for hysteresis, the non-inverting input signal should now be connected to the INA+SENSE SMA connector. The reason for this is hysteresis requires both a series input resistor and a feedback resistor from output to input.
  • Page 10: Figure 5-5. Tlv3602 Hysteresis Schematic For Channel A

    Channel A. FEEDBACK Input Resistor Input Signal (INB+SENSE) INB+ OUTB TLV3602B INB- – Figure 5-6. TLV3602 Hysteresis Schematic for Channel B TLV3602EVM User's Guide SNOU193 – MAY 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 11: Layout Guidelines

    Layout Guidelines 6 Layout Guidelines Top Layer Signal Layer 1 Signal Layer 2 Bottom Layer Figure 6-1. Layers SNOU193 – MAY 2022 TLV3602EVM User's Guide Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 12: Schematic

    Schematic www.ti.com 7 Schematic Figure 7-1. TLV3602EVM Schematic TLV3602EVM User's Guide SNOU193 – MAY 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 13: Bill Of Materials

    Schematic 8 Bill of Materials Table 8-1. TLV3602EVM Bill of Materials DESIGNATOR VALUE DESCRIPTION PACKAGE REFERENCE PART NUMBER MANUFACTURER C1, C4 0.01μF CAP, CERM, 0.01 uF, 50 V, +/- 10%, X7R, 0603 0603 GRM188R71H103KA01D MuRata C2, C5 100pF CAP, CERM, 100 pF, 10 V, +/- 10%, X7R, 0603...
  • Page 14 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 15 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 16 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 17 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 18 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 19 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

Table of Contents