www.ti.com
3 Test Data and Performance Curves
Because actual performance data can be affected by measurement techniques and environmental variables,
these curves are presented for reference and can differ from actual field measurements. Unless otherwise
indicated, V
= 24 V, V
IN
OUT
3.1 Efficiency and Load Regulation Performance
This section provides efficiency and load regulation plots for the EVM.
100
95
90
85
80
75
70
0
1
2
Output Current (A)
Figure 3-1. Efficiency, V
AUTO Mode
100
95
90
85
80
75
70
0
1
2
Output Current (A)
Figure 3-3. Efficiency, V
AUTO Mode
SLVUCN1 – JANUARY 2023
Submit Document Feedback
= 5 V, I
= 8 A, and F
OUT
VIN = 12 V
VIN = 24 V
VIN = 36 V
3
4
5
6
7
= 5 V, F
= 1 MHz,
OUT
SW
VIN = 12 V
VIN = 24 V
VIN = 36 V
3
4
5
6
7
= 3.3 V, F
= 1 MHz,
OUT
SW
Copyright © 2023 Texas Instruments Incorporated
= 1 MHz.
SW
5.05
5.025
5
4.975
4.95
0
1
8
Figure 3-2. Load Regulation, V
MHz, AUTO Mode
3.345
3.33
3.315
3.3
3.285
3.27
3.255
0
1
8
Figure 3-4. Load Regulation, V
MHz, AUTO Mode
TLVM13610EVM Buck Regulator Evaluation Module
Test Data and Performance Curves
VIN = 12 V
VIN = 24 V
VIN = 36 V
2
3
4
5
6
Output Current (A)
= 5 V, F
OUT
VIN = 12 V
VIN = 24 V
VIN = 36 V
2
3
4
5
6
Output Current (A)
= 3.3 V, F
OUT
7
8
= 1
SW
7
8
= 1
SW
7
Need help?
Do you have a question about the TLVM13610EVM and is the answer not in the manual?