Toro 34225 Operator's Manual page 29

Stand-on spreader/sprayer
Table of Contents

Advertisement

Connecting the Rate-Gate Linkage
1.
Pull the linkage out until it clears the drop-rate
cam
(Figure
30).
2.
Move the wide-distribution impeller-gate lever
forward.
3.
Attaching the cable to the ball stud at the gate
lever(Figure
30).
Assembling the Impeller
1.
Assemble impeller onto the impeller shaft and
secure the impeller with the drive pin.
2.
Align the holes in the front cover with the clip
nuts in the chassis and secure the cover with
the 4 thumbscrews that you removed in step
of
Removing the Impeller (page
3
27).
29

Advertisement

Table of Contents
loading

Table of Contents