Louver Installation - Friedrich VPR VRP07K Installation & Operation Manual

Variable refrigerant packaged heat pump
Table of Contents

Advertisement

Louver Installation

Installation of the louver PRIOR to Wall Plenum Installation
1) Hold the louver up to the outside plenum half (Part A) and line up the louver top with the very top edge of the
¾" flange.
2) Line up the wall plenum holes with the threaded holes in the louver and securely tighten fasteners.
Installation of the louver AFTER the installation of wall plenum on
elevated floors
From the interior of the utility closet:
1) Tie a rope or tether to the architectural louver and the divider in
the wall plenum to prevent it from falling if dropped.
3) Turn the louver sideways and push the louver out below the
divider in the wall plenum.
4) Pull the louver back against the wall plenum and align the holes.
5) Insert and tighten all eight provided fasteners. When the louver
is secured, remove the safety tether.
19
Attach louver with 8
screws provided
Louver
Wall Plenum
NOTE: Louvers & Drip Ledge orientation is down
SIDE
Optional Pre-assembled Outside
Element (Grill and Plenum)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vpr vrp07r

Table of Contents