Final Drain Installation
NOTE: Failure to follow the following procedures may result in serious property damage. A field supplied secondary
condensate pan may be required. Check with local codes. In case of drainage system blockage, the unit base will allow
excess water to flow out of the unit through the plenum and the architectural louver. It is critical to ensure that the
drainage path is not blocked or obstructed in any way during installation.
1)
Ensure the drain pan is not inserted beyond 1.5 inches into the sleeve.
2)
Attach the drain pan to the closet floor with the appropriate field supplied hardware.
3)
Use the supplied drain plug to plug the unused port on the VPDP2. Proper sealant must be applied to prevent
leaks.
4)
Use one of the first three options above for routing of the drain line.
5)
Check the system for leaks.
Option 1
Run condensate line
to left of unit
Option 3
Run condensate line
to right of unit
Option 2
Run condensate line
beneath unit platform
Option 4
Do not run
condensate line
back toward unit
18