Figure 4-8. Isbm And Upm Sections Joined (Three Upm Section Shown) - Eaton Power Xpert 825/550 Installation And Operation Manual

450–825 kva
Table of Contents

Advertisement

Figure 4‐8. ISBM and UPM Sections Joined (Three UPM Section Shown)
t
Power Xpert
9395 UPS (450–825 kVA) Installation and Operation Manual
UPM Wireway
(Power wiring harnesses are coiled in this area.)
10. Reinstall the left top panel (see Figure 4‐7) and secure using the retained
hardware.
NOTE Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM and UPM
sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle
panel of the UPM section). Locate two flat brackets and screws from the
hardware kit. Align the holes in the flat brackets over holes in the top rear and
top front of the ISBM and UPM sections. Secure the brackets with the screws
from the hardware kit (see Figure 4‐9).
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the
flat bracket over holes in the front base of the ISBM and UPM sections. Secure
the bracket with the screws from the hardware kit (see Figure 4‐9).
13. Proceed to paragraph 4.4.
S
www.eaton.com/powerquality
164201725 Rev 9
UPS SYSTEM INSTALLATION
4-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert plus 1Power xpert 9395

Table of Contents