Download Print this page

Toro Multi Pro 5600 Service Manual page 143

Hide thumbs Also See for Multi Pro 5600:

Advertisement

4. If boom valve motor assembly is to be removed:
A. Unplug boom valve motor electrical connectors
from machine wiring harness.
B. Remove pressure gauge tube from boom valve
motor assembly.
C. Remove three (3) flange head screws and three
(3) locknuts that secure boom valve motors to mount
bracket (Fig. 20). Remove boom valve motor assem-
bly from machine.
5. If agitation valve motor is to be removed:
A. Unplug agitation valve motor electrical connec-
tors from machine wiring harness.
B. Remove flange head screw and locknut that se-
cure agitation valve motor to mount bracket (Fig. 20).
Remove agitation valve motor from machine.
6. Remove additional spray control components as re-
quired using Figure 18 as a guide. Discard all removed
o–rings and gaskets.
Assembly (Fig. 18)
NOTE: Coat all o–rings with vegetable oil before instal-
lation to reduce the chance of damage during assembly.
1. Install spray control components using Figure 18 as
a guide. Replace all removed o–rings and gaskets.
2. Position removed motor assembly to mount bracket
and secure with fasteners removed during disassembly
(Fig. 20).
3. Secure support bracket to mount bracket with two (2)
flange head screws and flange nuts.
4. Install hoses to correct locations on spray control as-
sembly (Fig. 19). Secure hoses with hose clamps.
5. If removed, install pressure gauge tube to boom
valve motor assembly.
6. Plug electrical connectors from valve motor(s) to ma-
chine electrical harness.
7. Operate spray system and check for leaks.
Multi Pro 5600
1
2
6
1. Agitation valve motor
2. Agitation supply hose
3. LH boom valve motor
3
4
1. Boom valve motors
2. Fork
3. Boom bypass hose
Page 6 – 21
4
5
3
6
Figure 19
4. Center boom valve motor
5. RH boom valve motor
6. Boom supply hose
2
5
6
Figure 20
4. Agitation valve motor
5. Flange head screw
6. Flange nut
Spray System
6
1
5

Advertisement

loading