Product Operation - WEG AFW900 User Manual

Cabinet built variable speed drives
Table of Contents

Advertisement

Available languages

Available languages

5 PRODUCT OPERATION

After checking that all installations were properly made, follow the procedure to operate the product.
Check that the control circuit breakers Q2 and Q3 are on.
During activation, the door must be closed.
Close the circuit breakers/disconnect switch Q1.
Check the "Powered Panel" indication.
Set the parameters on the HMI according to the project.
Check that the emergency button is pressed.
Check the "Defect" indication; if activated, solve it before proceeding with the procedure.
Use the on and off buttons to control the system.
NOTE!
In case of remote operation, the remote emergency button must be checked, and the system can
be controlled using the remote buttons.
Product Operation
AFW900 | 32

Advertisement

Table of Contents
loading

Table of Contents