UPS Installation Plan and Unpacking
Table 12. Separate Rectifier Input UPM Power Cable Terminations for the Power Xpert 9395-275/225 and 9395-275/275
Terminal Function
AC Input to each UPM
Rectifier
Conduit sizes were chosen from NEC Table 4, Electrical Metallic Tubing (EMT). See
requirements.
Per NEC article 300, 3(B)(1), all three-phase conductors must be run in the same conduit. Neutral and ground
must be run in the same conduit as the phase conductors.
Conduit is sized to accommodate one neutral conductor the same size as the phase conductor and one ground
conductor sized in accordance with NEC Table 250.122.
Conduit sizes listed are for copper wiring only.
28
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201710—Rev 14
Terminal
Function
E1
Phase A
E2
Phase B
E3
Phase C
Tightening Torque
Size of Pressure
Nm (lb ft)
Termination
42.4 (375)
2 - #6-250 kcmil
42.4 (375)
2 - #6-250 kcmil
42.4 (375)
2 - #6-250 kcmil
Type Screw
5/16" Hex
5/16" Hex
5/16" Hex
Table 13
for conduit