APPENDIX B: 'PIECE BY PIECE' INSTALLATION
There is an opening at the bottom of the foam plenums which
will allow hand access to the clips which are holding the inner
plenum to the supply venturi assembly. These need to be
unclipped on all 4 sides to free the plenum assembly. Reach in
and pull the clip backwards towards you then carefully pop the
plenum up. Repeat this on all four corners until the plenum pops
up freely.
Lift the assembly up and set aside. Do not disassemble the
foam from the inner plenum.
Reposition the vertical hose pillars so that they are resting
inside of the tank where they are out of the way.
COOLER READY TO LIFT.
DO NOT BREAK DOWN ANY FURTHER.
Transporting the cooler to the roof:
Caution! Do not take risks when raising the cooler to the
roof for installation. Use safety equipment, appropriate
ILL3123-A
procedures and always have assistance. It is recommended
that at least 2 people transport the cooler components
onto the roof. Ensure the cooler is in the specified state of
disassembly before transporting.
Begin by securing the hoses, mains and communication cables
in the tank with some duct tape to prevent the hose circuits
becoming tangled and dislodged whilst lifting.
Attach ropes or slings through the central tank hole. Do not drop
the cooler. Always handle the cooler with care. If you intend
to pull the cooler onto the roof using a ladder as a slide, then
guide the cooler on the underside of the tank. Important! This
assembly is bulky and weighs approx. 35kg.
With a minimum of two persons, transport the bottom half of the
cooler to the roof.
ILL3124-A