6.) Unscrew four screws to separate FAN Assy.
8-16-4

Installation Procedure

1.) Parts to be installed in reverse order of removal.
8-16-5

Functional Check

Visual examination.
1.) Verify that Fan is rotating when system is turned ON.
2.) Verify that LED indicator flickers when system is turned ON.