Completing The Set Up; Connecting The Unit To A Power Source; Power On / Boot Up; Scanner Power On - GE LOGIQ S8 Service Manual

Hide thumbs Also See for LOGIQ S8:
Table of Contents

Advertisement

GE H
DRAFT
EALTHCARE
D
5394227, R
IRECTION
EVISION
Section 3-6

Completing the Set Up

3-6-1

Connecting the Unit to a Power Source

The connection of the LOGIQ™ S8 ultrasound unit to a power source should be performed by a
qualified person who has completed basic LOGIQ™ S8 System User Training. Use only the power
cords, cables and plugs provided by or designated by GE Healthcare to connect the unit to the power
source.
Prior to connect the LOGIQ™ unit to a power source, verify compliance with all electrical and
CAUTION
safety requirements. Check the power cord to verify that it is intact and of hospital-grade.
!! CAUTION:
Products equipped with a power source (wall outlet) plug should be connected to the fixed
power socket that has a protective grounding conductor. Never use an adapter or converter to
connect with a power source plug (for example, a three-prong to two-prong converter).
The unit's power must be supplied from a separate, properly rated outlet to avoid risk
WARNING
WARNING
of fire. Refer to
!! WARNING:
rating information. The power cord should not, under any circumstances, be altered to
a configuration rated less than that specified for the current.
Whenever disconnecting the LOGIQ™ system from the electrical outlet, always observe the
CAUTION
safety precautions. First unplug the main power cable from the wall outlet socket, then from the
!! CAUTION:
unit itself. Remove by pulling on the cable connector - DO NOT pull on the cable.
The LOGIQ™ S8 requires all covers!
CAUTION
Operate this system only when all board covers and frame panels are securely in place.
!! CAUTION:
The covers are required for safe operation, good system performance and cooling purposes.
3-6-2

Power On / Boot Up

3-6-2-1

Scanner Power On

1.) Connect the Main Power Cable to the back of the system. Refer to
2.) Connect the Main Power Cable to a hospital grade power outlet with the proper rated voltage.
Never use an adapter that would defeat the safety ground.
3.) Switch ON the Circuit at the rear of the system.
3
DRAFT (N
Section 2-2-2-1 "LOGIQ™ S8 Power Requirements" on page 2-3
Figure 3-10 Circuit and main power cable at rear of system
Chapter 3 - Setup Instructions
17, 2011)
OVEMBER
S
ERVICE
Section 8-23
for details.
Circuit
Main Power
LOGIQ™ S8
M
ANUAL
for
3-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents