Operation; Training The Operating Personnel; Emergency Stop; Tasks - WAGNER TOPFINISH DD10 Alu NiP Translation Of The Original Operating Manual

Pneumatic double diaphragm pump
Table of Contents

Advertisement

Operating manual Pneumatic double diaphragm pump TOPFINISH DD10 Alu NiP
7   Operation
7   OPERATION
7.1   TRAINING THE OPERATING PERSONNEL
– The operating personnel must be qualified to operate the entire system.
– The operating staff must be familiar with the potential risks associated with improper
behavior as well as the necessary protective devices and measures.
– Before work commences, the operating personnel must receive appropriate system
training.
7.2   EMERGENCY STOP
In the case of unforeseen occurrences:
1. Close the ball valve.
2. Interrupt the air supply.
1
B_05379
Pos Designation
1
Open
2
Closed
7.3   TASKS
1. Ensure that:
4 commissioning is carried out in accordance with Chapter Commissioning [8 29].
4 the regular safety checks are carried out in accordance with Chapter Safety Checks
and Maintenance Intervals [8 37],
2. Carry out a visual inspection: Personal protective equipment, grounding and all devices
ready for use.
3. Secure spray gun and insert nozzle into the spray gun.
4. Slowly open the ball valve.
5. Set the required working pressure on the pressure regulator.
6. Optimize the spray pattern as laid down in the spray gun instructions.
7. Start work process.
7.4   PRESSURE RELIEF / WORK INTERRUPTION
The pressure must always be relieved:
– after the spraying tasks are finished,
– before servicing or repairing the system,
– before carrying out cleaning tasks on the system,
– before moving the system to another location,
– before something needs to be checked on the system,
– before the nozzle or the filter is removed from the spray gun.
The components for pressure relief on a CE-compliant spraying system include:
Order number DOC 2366672 | Edition 08/2020
2
31

Advertisement

Table of Contents
loading

Table of Contents