Test Menu 5: Pulse Output Operation Test - Mitsubishi Electric ME96SSHA-MB User Manual

Electronic multi-measuring instrument
Hide thumbs Also See for ME96SSHA-MB:
Table of Contents

Advertisement

4. Using Test Mode
4.5. Test Menu 5:
Pulse Output Operation Test
The following operations are available in the test mode.
・When the ME-4210-SS96 optional plug-in module is not installed, this test menu will be skipped.
・When ⑨Pulse/Alarm output 1(Setting Menu 5) and ⑫Pulse/Alarm output 2(Setting Menu 5) is not set to "PULSE",
this test menu will be skipped.(ME-4210-SS96)
DISPLAY
Pulse output CH1
operation test
DISPLAY
Pulse output CH2
operation test
Test menu
Execute the operation test for pulse output CH1.
(Input is not necessary.)
When
is pressed, 1 pulse is output.
RESET
・・・
0
1
2
Note1: When Pulse/Alarm output 1(Setting Menu 5) is not set to "PULSE",
this display will be skipped.(ME-4210-SS96)
Note2: Output is executed according to the set pulse width.
Note3:
After reaching 50,
the number of output pulses
Execute the operation test for pulse output CH2.
The test method is the same as
①Pulse Output CH1 Operation Test .
Note: When Pulse/Alarm output 2(Setting Menu 5) is not set to "PULSE",
this display will be skipped.(ME-4210-SS96)
<To continue other test mode>
Select other test menu number and then press
<To close test mode>
Select "End" as the test menu number and then press
You will return to the operation mode.
Upper :Pulse output 1
49
50[pulse]
Middle :Pulse Unit set up with setting menu 5.9.2.
Lower
Left :The number of output pulses
Right :(Pulse Unit)×(The number of output pulses)
returns to 1.
SET
62
.
.
SET

Advertisement

Table of Contents
loading

Table of Contents